Filed: balances through 30 Jun 2026 (Q2 2026 10-Q). Modeled: each facility fully drawn by the end of its draw window, then paid down on its filed schedule, or straight-line to final maturity where none is filed.
Not included: Revolver (letter-of-credit line for utility and vendor deposits; no cash borrowings filed) · FalconX BTC-collate… (bitcoin-backed loan) · Two Prime revolver (bitcoin-backed line, never drawn) · SAFE (SAFE) · Coinbase Bitcoin-co… (bitcoin-backed line, repaid May 2026) · Anchorage equipment… (exchanged for shares in 2024).
Fixed Coupons at Issue
Not plotted (no single filed coupon or no dated issue): Finance lease: Iroq….
Facility ratings
BBB-S&P2026-09-236.192% Senior Secured Notes due 2042 (River Bend LA, 245 MW project bond)
Baa2Moody's2026-08-046.129% Senior Secured Notes due 2042 (Nueces County TX, 352 MW project bond)
BBB-Fitch2026-05-066.192% Senior Secured Notes due 2042 (River Bend LA, 245 MW project bond)
Capital stack by borrower
Which entity owes what, as filed. Facilities raised in a
subsidiary sit on that subsidiary's assets, plus any parent
guaranty shown on the card. The parent's own paper sits beside
them.
Hut 8 Corp. (borrower); certain restricted subsidiaries as guarantors
Seniority
Senior secured, parent level
Maturity
2030-09-24 — Revolving until the fourth anniversary of the Closing Date
Collateral
First-priority lien on substantially all personal property and pledged equity of the Company and the Guarantors; real property (other than equipment) excluded
Lenders
JPMorgan Chase Bank, N.A. (admin + collateral agent; lead left arranger) · Citi, Goldman Sachs, Morgan Stanley (joint lead arrangers) · Issuing banks and lenders party thereto
Pricing
Adjusted Term SOFR (0.00% floor) + 1.50% to 2.00% by Consolidated Total Debt to Market Capitalization Ratio; initial margin 1.75% (ABR + 0.50% to 1.00%, initial 0.75%). Commitment fee 0.25% a year on unused commitments (Q3-26 10-Q).
Terms
Up to $1,070.0M revolving, with a $1,070.0M letter-of-credit sublimit; $0 outstanding at the 9/24/26 closing. Minimum liquidity tested quarterly from the quarter ending 3/31/27: 40% of aggregate commitments before the Stabilization Date, 25% after, with equity cure rights. Per the 9/28/26 release, the L/C sublimit supports interconnection deposits and obligations to utilities and equipment vendors; syndicate of 12 lenders.
6.129% Senior Secured Notes due 2042 (Nueces County TX, 352 MW project bond)
Bond$4,250m6.129%Entered 2026-06-09
Borrower
Beacon Point DC LLC (issuer); Beacon Point Holding LLC (direct parent; pledges the issuer's equity)
Seniority
Senior secured, project-level; non-recourse to parent
Maturity
2042-11-30 — Principal semi-annual from 5/30/30; par call 5/30/42
Collateral
1st liens + equity pledge; equity pledge held by Beacon Point Holding LLC; asset fully leased under a triple-net lease (Q2-26 10-Q)
Offtaker
Unnamed tenant rated AA- or higher (triple-net lease)
Lenders
144A via J.P. Morgan (representative) · Wilmington Trust (trustee and collateral agent)
Pricing
Fixed schedule, fully amortizing from May 30, 2030 (indenture Sec. 14.02); investment-grade rated (Moody's Baa2, Q2-26 10-Q)
Terms
Issuance costs $46.4M (Q2-26 10-Q). $4.25B principal at 9/30/26; effective rate 6.27%; Level 2 fair value $3.90B (Q3-26 10-Q). The Phase 1 tenant signed a second 352 MW lease for Phase 2 in July 2026, so the campus is fully contracted. Hut 8 is evaluating financing structures for Phase 2; none is signed (Q3-26 10-Q; 11/4/26 release).
Bitcoin at BitGo (143% initial ratio; 130% margin call; 105% liquidation; excess collateral may be returned above 163%). The custodian is BitGo Bank & Trust, N.A. (Q1-26 10-Q Item 5).
Lenders
FalconX Charlie, Inc.
Terms
$200M drawn. Recourse limited to the pledged Bitcoin, held in a segregated custody account under the Company's ownership with a third-party custodian; prepayable free after 6 months (0.125-0.25% early-termination fee before) (Q2-26 10-Q). At 9/30/26, $200.0M was outstanding, secured by 4,850 pledged Bitcoin with a fair value of $404.6M. Part of that Bitcoin also secures call options Hut 8 sold. Hut 8 intends to repay the loan before maturity (Q3-26 10-Q).
6.192% Senior Secured Notes due 2042 (River Bend LA, 245 MW project bond)
Bond$3,250m6.192%Entered 2026-04-30
Borrower
Hut 8 DC LLC (issuer); Hut 8 DC Member LLC (direct parent; pledges the issuer's equity)
Seniority
Senior secured, project-level; non-recourse to parent
Maturity
2042-11-15 — Interest semi-annual May 15/Nov 15 from 11/15/26; principal semi-annual from 5/15/28; par call 5/15/42 (make-whole before)
Collateral
1st liens on substantially all issuer assets + equity pledge; the Data Center Lease with Fluidstack USA IV Inc. and Google's guarantee of it (dated 2025-12-15) are Project Documents under the indenture
Offtaker
Fluidstack USA IV Inc. (tenant); Google LLC guarantees the lease
Lenders
144A via J.P. Morgan (representative) · Wilmington Trust (trustee/collateral)
Pricing
Fixed schedule, fully amortizing from May 15, 2028 (indenture Sec. 14.02); rated BBB− (S&P/Fitch)
Terms
Issuance costs $54.0M (Q2-26 10-Q). $3.25B principal at 9/30/26; effective rate 6.41%; Level 2 fair value $3.05B. The notes are obligations solely of Hut 8 DC; Hut 8 Corp., the tenant and the lease guarantor do not guarantee them (Q3-26 10-Q).
Hut 8 MB One LLC (borrower); Hut 8 Mining Holding Corp. (pledgor)
Seniority
Secured; recourse limited to BTC collateral
Maturity
364 days from first borrowing
Collateral
BTC collateral account at BitGo Trust Company, pledged by Hut 8 Mining Holding Corp. (160% initial; 135% top-up; full repayment due at 125%)
Lenders
Two Prime Lending Limited
Terms
Up to $200.0M; $0 drawn. TERMINATED in September 2026, never drawn: after its JPMorgan revolving credit facility closed (hut-jpm-rcf-2026), Hut 8 terminated the Two Prime Credit Agreement, under which $200.0M of undrawn capacity had been available (Q3-26 10-Q, Note 11 and MD&A). The exact day is not filed.
Liability-classified SAFE (ASC 480); no security stated
Maturity
Converts on equity financing
Lenders
Related party (unnamed)
Pricing
No interest stated; converts on equity financing
Terms
$3.5M ($3.303M fair value 6/30/26; Q2-26 10-Q). $3.275M fair value at 9/30/26; the company assumes an 85% chance it converts to equity within 12 months (Q3-26 10-Q).
$150.0M original principal issued 6/28/24; PIK accreted to $159.3M. Initial conversion price $16.395; 5-year term extendable three 1-year terms; contingent repurchase right on a change of control or delisting: 150% of original principal if the deal values the stock at $11.50 or more, otherwise accreted principal plus interest. CONVERTED IN FULL 2026-05-11: $159.3M accreted principal into 9,715,476 shares at $16.395; $1.3M accrued interest paid in cash (Q2-26 10-Q).
Hut 8 Mining Corp. (borrower from the 1/12/24 A&R; originally Hut 8 Holdings Inc.)
Seniority
Secured. Parent guaranty (Hut 8 Mining Corp., then Hut 8 Corp. as successor) until the 6/17/24 Second A&R. Recourse limited to the BTC from the 6/16/25 Third A&R.
Maturity
2026-06-16
Collateral
Bitcoin held at Coinbase Custody Trust Company, LLC
Lenders
Coinbase Credit, Inc. (lender, collateral agent, administrative agent)
Pricing
9.0% from 6/16/25 (Third A&R); before that, the greater of the Fed Funds upper bound or 3.25%, plus 5.0% (6.0% from the 6/17/24 Second A&R)
Terms
Inception 6/26/23; A&R 1/12/24 and 6/17/24; Third A&R 6/16/25 (+$65M to $130M, rate to 9.0%, maturity to 6/16/26, early-termination fee removed); Amendment No. 1 (dated as of 8/1/25; Q3-25 10-Q EX-10.1) extended the $65M availability to maturity, with a 1.5% fee on undrawn amounts from 9/30/25; the $65M was drawn in full Aug 2025; Fourth A&R 12/22/25 (+$70M to $200M, drawn in full same day). $200.0M outstanding 12/31/25. REPAID IN FULL AND TERMINATED May 2026 with proceeds of the $200M FalconX 7.0% Bitcoin-collateralized term loan; collateral released (Q2-26 10-Q; exact day not filed).
TZRC secured promissory note (assumed with King Mountain JV)
Credit facility$96.8mLesser of WSJ prime + 12.0% or 1…Entered 2022-12-06Repaid 2026-10-05
Borrower
USBTC subsidiary holding the 50% TZRC interest (obligor); non-recourse to Hut 8 Corp.
Seniority
Secured; non-recourse
Maturity
2027-04-08
Collateral
1st-priority interest in TZRC membership interest
Lenders
Payee undisclosed
Pricing
Lesser of WSJ prime + 12.0% or 15.25% cap — at cap, PIK elected
Terms
$35.1M at 6/30/26 (vs $49.6M at 12/31/25), including PIK; rate at the 15.25% cap at both dates; Q2-26 PIK $1.4M; +2% post-default (Q2-26 10-Q). Size is the original approximately $96.8M promissory note assumed (S-4/A 2023). $26.4M of principal and PIK interest (excluding a $0.2M discount) at 9/30/26, after $27.6M of principal payments in the first nine months of 2026. REPAID IN FULL 2026-10-05 for $26.5M, the $26.4M plus interest accrued to the repayment date; the remaining discount went to interest expense (Q3-26 10-Q, Note 11 and MD&A).
Credit facility$50m12.00%Entered 2022-03-31Exchanged for stock 2024-09-27
Borrower
US Data Guardian LLC (borrower); USBTC and USDTG guarantors; Hut 8 Corp. guarantor by joinder from 11/30/23
Seniority
Senior secured; subsidiary borrower, Hut 8 Corp. guarantor from 11/30/23
Maturity
2028-02-02 — Cash sweep from 3/15/23; balloon due 2/2/28 (Loan, Guaranty and Security Agreement); equitized 9/27/24 before maturity.
Collateral
Miners at Alpha (Niagara Falls, NY) and Wolf Hollow (Granbury, TX): 23,509 at the 2/3/23 restructuring. Lien narrowed at the 11/30/23 merger. The FY24 10-K describes ~21,000 miners at Alpha and Salt Creek.
Lenders
Anchorage Lending CA, LLC
Pricing
Original ELSAs 12%. Restructured loan: 14% of the loan amount in year 1; year 2 set at 23% less year-1 cash paid (Loan, Guaranty and Security Agreement)
Terms
Two ~$25.0M Equipment Loan and Security Agreements (3/31/22 + 4/26/22, 12%) funding miners; restructured 2/3/23 into a Loan, Guaranty and Security Agreement with PIK option and 100% cash-sweep amortization from designated miners. The 10-KT's 14.0% is the year-1 rate. The FY24 10-K states 9.0%, which fits the year-2 step (inferred; the April 2023 amendment is not filed). EQUITIZED 2024-09-27: $37.9M outstanding exchanged for 2,313,435 shares at $16.395; $6.0M extinguishment gain (FY24 10-K).
Finance lease: Iroquois Falls, Ontario power plant (Far North JV)
Lease$20.8m10.00%Repaid 2026-02-02
Borrower
Far North JV (sold to TransAlta Corporation on 2/2/26)
Seniority
Finance lease
Collateral
Leased power plant at Iroquois Falls, Ontario
Lenders
Lessor not named
Pricing
10.0% is Hut 8's weighted-average discount rate on finance leases at 12/31/25. No filing states the lease's implicit rate.
Terms
Lease liability carried at $20.8M immediately before the sale. BOUGHT OUT 2/2/26: at the closing of the Far North JV sale to TransAlta, $27.9M (C$38.9M) was paid to the finance lease lessor, made up of $24.7M for the buyout and $3.2M of indirect taxes. The buyout exceeded the carrying amount by $3.9M. Hut 8 had no finance leases at 9/30/26 (Q3-26 10-Q, Notes 3 and 13).
Source: Q3-26 10-Q Note 3 (Far North JV sale) and Note 13 (Leases) · document
Collateral classes on this page: out, operator_campus. The full
ledger, with every issuer and the derived credit series, is on GPU Debt Tracker.