Credit Market Intelligence · Compute Credit as of 2026-11-09

Data-Center Debt Tracker

The debt behind the buildings that house AI compute: data-center landlords, campus operators, miners building for AI tenants and hyperscaler joint ventures. Each row names the tenant and the site where the filings do, and links the document. GPU borrowers and their full debt stacks are on GPU Debt.

$386.7B data-center debt signed since January 2024, across 214 deals

Data-center-collateralized debt issuance, by quarter
Amount committed at signing, by quarter · line = cumulative signed, through the last complete quarter
AS FILED
0 20 40 60 80 0200400600800 $B issued / qtr cumulative signed $B (data center) 2024 Q1: Data-center-collateralized $5.3B · $9B cumulative 2024 Q1 2024 Q2: Data-center-collateralized $13.8B · $23B cumulative 2024 Q2 2024 Q3: Data-center-collateralized $8.2B · $31B cumulative 2024 Q3 2024 Q4: Data-center-collateralized $13.1B · $44B cumulative 2024 Q4 2025 Q1: Data-center-collateralized $24.6B · $69B cumulative 2025 Q1 2025 Q2: Data-center-collateralized $21.5B · $90B cumulative 2025 Q2 2025 Q3: Data-center-collateralized $63.7B · $154B cumulative 2025 Q3 2025 Q4: Data-center-collateralized $65.0B · $219B cumulative 2025 Q4 2026 Q1: Data-center-collateralized $35.1B · $254B cumulative 2026 Q1 2026 Q2: Data-center-collateralized $61.6B · $315B cumulative 2026 Q2 2026 Q3: Data-center-collateralized $52.0B · $367B cumulative 2026 Q3 2026 Q4 (QTD): Data-center-collateralized $22.8B · $390B cumulative 2026 Q4*
Data-center-collateralized, by quarter Cumulative signed * current quarter, partial — backfills as filings land
Notes

Bars are data-center-collateralized issuance: 247 instruments, $391.6B, secured by a data center: a landlord or project company, an operator's campus, data-center asset-backed notes or construction debt. 10 of them ($16.3B) are financings by GPU borrowers, such as Crusoe's Abilene construction loans; their rows are on the GPU Debt tab. As of 2026-11-09. Observed from filings, releases and, for some private deals, press reports: the amount committed at signing or close, not the drawn or outstanding balance. A facility upsized later counts each signing on its own date. Guarantees such as residual value guaranties and backstops are not issuance and stay off the bars, as do loans secured by a campus's power equipment rather than its buildings. The current quarter (*) is partial and backfills as deals are recorded. Undated (in the total, not in the bars): 8 instruments ($1.4B). Pre-2024 issuance ($3.5B) sits in the cumulative line's starting level, outside the bars. Coverage: deals are added issuer by issuer and from bond-holder filings and reporting. Data-center securitizations from issuers outside the tracker are not all captured.

Ledger

Every data-center financing on file, plus the corporate bonds and convertibles of the listed operators and miners, so their full stacks sit in one place. The tenant is named on 45 rows and the site on 63. 6 rows carry a backstop from a third party, mostly Google. Filter by tenant to see every financing behind one company's leases.

Ledger updated 2026-11-09

Issuer Lenders / Agents Instrument Tenant Site Source Type Size $M Rate Issued Maturity Seniority Status
AdaniConneX (Adani Enterprises / EdgeConneX JV) ING Bank NV +7 US$875M sustainability-linked construction financing (accordion to US$1.44B) — — Outlook Business 2024-04-28 (company statement) Credit facility 875 Undisclosed 2024-04-28 — other press
AdaniConneX (Adani Enterprises / EdgeConneX JV) In talks: DBS, First Abu Dhabi Bank, MUFG, Natixis, ING, Societe Generale (press) About US$1.5B offshore loan for AdaniConneX data centers (in talks) — — The Tech Capital 2026-11-05, citing Bloomberg Credit facility 1,500 Undisclosed Reported 2026-11-05; not signed Undisclosed other rumored
Affinius Capital / Corscale Data Centers JV (Gainesville Crossing, VA) Blue Owl (balance-sheet lender) +1 $975M balance-sheet loan, Project Helios (Gainesville Crossing campus, VA) — — Newmark release 2026-06-08 (PR Newswire) Credit facility 975 Undisclosed 2026-06 — other confirmed
AirTrunk (Blackstone) More than 60 banks and financiers (not named in the release) A$16B (ex-Japan) sustainable refinancing: four green loans / sustainability-linked loans — — AirTrunk release 2025-08-25 Credit facility 10,400 Undisclosed 2025-08-25 — other confirmed
AirTrunk (Blackstone) SMBC (global coordinator) +11 JPY 191.6B green loan, TOK1 Tokyo campus — — AirTrunk release 2026-03-10 Credit facility 1,240 Undisclosed 2026-03-10 — other confirmed
AirTrunk (Blackstone) BNP Paribas (global coordinator) +14 US$2.325B (RM9.5B) green project financing, JHB2 Johor Bahru campus — — AirTrunk release 2026-07-29 Credit facility 2,325 Undisclosed 2026-07-29 — other confirmed
AirTrunk (Blackstone) Ten banks (press), including SMBC, MUFG and The Chiba Bank About US$1B (about JPY 155B) green loan, TOK1 campus development (October 2026) — — Impress Cloud Watch 2026-10-13 (AirTrunk media briefing 2026-10-07) Credit facility 1,000 Undisclosed 2026-10-07 — other press
AirTrunk (Blackstone) Banco Santander +13 A$4.25B green construction loan, SYD3 hyperscale data center (Western Sydney) — Western Sydney, Australia release AirTrunk release 2026-10-27, 'AirTrunk Secures A$4.25B Green Loan For SYD3 Western Sydney Expansion' Credit facility 2,977 Undisclosed 2026-10-27 ~2031 other confirmed
AirTrunk (Blackstone) Not named About US$1.6B SGD and JPY loan for the proposed AirTrunk Singapore REIT (reported) — — Bloomberg via w.media 2026-09-21 Credit facility 1,600 Undisclosed Reported 2026-09-21; not signed Undisclosed other rumored
Aligned Data Centers PGIM (anchor lender, press) +1 $2.58B development revolving credit facility (six later-stage assets) — Dallas, Texas press +1 Aligned Data Centers release 'Aligned Data Centers Closes on $2.58 Billion Credit Facility' (2026-03-26) Credit facility 2,580 Undisclosed 2026-03-26 ~2029-03 secured confirmed
Aligned Data Centers Morgan Stanley (sole structuring advisor; press: Asset Securitization Report 2026-06-25) Term ABS notes, Class A-2-I + Class B, $1.183B securitization — Ashburn and Sterling, Virginia press +2 Aligned Data Centers release 7/28/26 (GlobeNewswire) Bond 1,183 5.909% 2026-07-28 ~2031 secured confirmed
Applied Digital Corporation APLD Starion Bank Starion Term Loan (Hosting) — Jamestown, North Dakota FY26 10-K debt note + subsequent events (acc 0001144879-26-000048) Credit facility 15 6.50% 2022-07-25 2027-07-25 secured confirmed
Applied Digital Corporation APLD Starion Bank Starion Ellendale Loan (ELN-01) MARA Ellendale, North Dakota FY26 10-K debt note + subsequent events (acc 0001144879-26-000048) Credit facility 20 7.48% 2023-02-16 2028-02-03 secured confirmed
Applied Digital Corporation APLD Cornerstone Bank Cornerstone Bank Loan (GPU-01) redacted Bank of North Dakota guarantee Jamestown, North Dakota FY26 10-K debt note + subsequent events (acc 0001144879-26-000048) Credit facility 16 8.59% 2024-02-28 2029-03-01 secured confirmed
Applied Digital Corporation APLD YA II PN, Ltd. (Yorkville) YA II PN (Yorkville) convertible promissory notes ($92.1M, three notes, 2024) — — FY24 10-K Note 7 (Yorkville Convertible Debt), acc 0001144879-24-000216 Convertible 92.1 0.00% 2024-03-27 2025-06-06 unsecured confirmed
Applied Digital Corporation APLD CIM APLD Lender Holdings, LLC CIM Promissory Note (Ellendale HPC / ELN-02) — Ellendale, North Dakota +2 8-K 6/7/24 (origination) Credit facility 125 12.00% 2024-06-07 2027-06-07 secured confirmed
Applied Digital Corporation APLD 144A; Wilmington Trust (trustee) 2.75% Convertible Senior Notes due 2030 — — FY25 10-K 7/30/25 Convertible 450 2.75% 2024-11-04 2030-06-01 unsecured confirmed
Applied Digital Corporation APLD Macquarie Equipment Capital, Inc. Macquarie Promissory Note (Ellendale / Polaris Forge 1, $150M) — Ellendale, North Dakota 8-K 12/2/24 (origination) Credit facility 150 0.25% 2024-11-27 2026-05-27 secured confirmed
Applied Digital Corporation APLD Sumitomo Mitsui Banking Corporation (administrative agent) +1 SMBC Credit and Guaranty Agreement ($375M term loans, Polaris Forge 1) CoreWeave Ellendale, North Dakota FY25 10-K (origination) Credit facility 375 SOFR +3.50% 2025-02-11 2026-08-11 secured confirmed
Applied Digital Corporation APLD Unnamed in the 10-Q; likely Texas Capital Bank (inferred; see note) Other long-term debt: two promissory notes (FQ2 FY2026) — — FY26 10-K debt note + subsequent events (acc 0001144879-26-000048) Other 18.5 Undisclosed 2025-09 to 2025-11 (fiscal Q2 2026) Undisclosed other confirmed
Applied Digital Corporation APLD Macquarie Equipment Capital, Inc. MEC Promissory Note (Polaris Forge 2 / Harwood, FAR-01, $50M) Oracle Harwood, North Dakota 8-K 9/12/25 (origination) Credit facility 50 8.00% 2025-09-09 2027-09-09 secured confirmed
Applied Digital Corporation APLD First National Bank of Omaha 2025 Revolving Credit Facility — — 10-K FY2026 (acc. 0001144879-26-000048), Debt note Credit facility 65 SOFR +2.75% 2025-11-10 — secured confirmed
Applied Digital Corporation APLD 144A; Morgan Stanley (representative) +1 9.25% Senior Secured Notes due 2030 CoreWeave Ellendale, North Dakota +1 Fiscal Q3 FY26 10-Q (ended 2/28/26, filed 4/8/26) Bond 2,350 9.25% 2025-11-20 2030-12-15 secured confirmed
Applied Digital Corporation APLD Macquarie Equipment Capital, Inc. DevCo Facility (MEC promissory note, new-project development) — Boyce, Louisiana inferred 8-K 12/22/25 (origination) Credit facility 100 8.00% 2025-12-18 2027-12-18 secured confirmed
Applied Digital Corporation APLD 144A; Goldman Sachs (representative) +1 6.750% Senior Secured Notes due 2031 Oracle Harwood, North Dakota +1 8-K 3/10/26 Bond 2,150 6.75% 2026-03-10 2031-03-15 secured confirmed
Applied Digital Corporation APLD Goldman Sachs Bank USA (administrative agent and collateral agent) +1 Goldman Sachs Bridge Facility ($300M, ELN-04 construction) CoreWeave Ellendale, North Dakota FY26 10-K Note 8 (origination Credit facility 300 SOFR +2.75% 2026-05-01 2027-04-30 secured confirmed
Applied Digital Corporation APLD First National Bank of Omaha (admin/collateral) +10 Revolving Credit Facility — — 8-K 6/26/26, credit agreement filed as EX-10.1 (redacted) and Incremental Assumption No. 1 as EX-10.2, acc 0001493152-26-030333 Credit facility 430 SOFR +2.25% 2026-05-29 2029-05-29 secured confirmed
Applied Digital Corporation APLD 144A; Goldman Sachs (representative) +1 7.000% Senior Secured Notes due 2031 CoreWeave Ellendale, North Dakota 8-K 6/16/26 Bond 1,590 7.00% 2026-06-16 2031-06-15 secured confirmed
Applied Digital Corporation APLD Texas Capital Bank Texas Capital Bank term loan — — FY26 10-K subsequent events (acc 0001144879-26-000048) Credit facility 58.5 SOFR +2.75% 2026-06-30 2031-06-30 secured confirmed
AtlasEdge ABN Amro +12 €738M committed seven-year financing facility (€1.2B with accordion) — — AtlasEdge release 2026-05-28 (carried by Light Reading) Credit facility 857.3 Undisclosed 2026-05-28 ~2033 other confirmed
BDx Data Centers Bank Permata (lead) +2 US$320M loan facility, Indonesian campuses (CGK3 Jakarta, CGK4 Jatiluhur, CGK5 Suryacipta) — — w.media, April 2026 (BDx secures US$320 million loan to fund data centers in Asia), citing a BDx release Credit facility 320 Undisclosed 2026-04 — other press
Blue Owl / Chirisa Technology Parks / PowerHouse Data Centers JV (Chirisa Technology Park, VA) Societe Generale (syndicate lead) +1 $600M construction loan, 50 MW CoreWeave build-to-suit (Chirisa Technology Park, Richmond VA) CoreWeave — Newmark release 2024-12-13 (PR Newswire) Credit facility 600 Undisclosed 2024-12 — other confirmed
Blue Owl Digital Infrastructure Trust Citibank, N.A. (administrative agent, collateral agent, lead arranger and bookrunner; lender and L/C issuer) +4 $750M revolving credit facility (A&R Revolving Credit Agreement, Citibank agent) — — Blue Owl Digital Infrastructure Trust 10-Q for the quarter ended 2026-09-30, acc 0002069692-26-000069 (Note 8 and MD&A Credit facility 750 SOFR +1.95% 2026-04-01 2030-04-01 secured confirmed
Blue Owl Digital Infrastructure Trust JPMorgan Chase Bank, N.A. (lender) +2 $559.1M fixed-rate CMBS mortgage loan, GCDC 1 Gainesville VA (BODI Commercial Mortgage Trust 2026-DC1) — — Blue Owl Digital Infrastructure Trust 8-K (Items 2.01, 2.03), report date 2026-06-23, filed 2026-06-29 Bond 559.1 5.465% 2026-06-23 2040-03 secured confirmed
Borealis Data Center (Vauban Infrastructure Partners) Infranity (term loan, $135M) +1 $148M term debt and revolving facilities (Iceland and Finland campuses) — — Borealis Data Center release on bdc.is (dateline on page reads 'February 7, 2024', a year typo) Credit facility 148 Undisclosed 2025-02-07 — other confirmed
Bridge Data Centres (Bain Capital) Consortium of international and cross-regional banks; more than 11 lead banks (release; not named) US$2.8B senior secured bank financing — — Bridge Data Centres release 2025-03-19 (PR Newswire via AAP) Credit facility 2,800 Undisclosed 2025-03-19 ~2030 secured confirmed
Bridge Data Centres (Bain Capital) Banks not named Upsize of the Malaysia senior bank loan to about US$6.6B (in talks) — — Bloomberg via w.media 2026-10-13 ('Bridge Data Centres seeks to double loan size to US$6.6 billion for Malaysian operations') Credit facility 3,800 Undisclosed Reported 2026-10-13; not signed Undisclosed secured rumored
Bulk Infrastructure Group ABN AMRO Bank N.V., Citibank Europe plc, Nordea Bank Abp (Mandated Lead Arrangers) +1 EUR 410M senior secured loan, N01 Data Center Campus (Vennesla, Norway) — — Bulk Infrastructure release 2025-11-03 (Oslo) Credit facility 472.1 Undisclosed 2025-11-03 — secured confirmed
CDC Data Centres (Infratil / Future Fund / CSC) Existing and new lenders (not named) A$2.7B bank debt raise (net A$2.1B added capacity) — — Infratil, CDC Independent Valuation - 31 March 2026 (exchange release 2026-04-08), not linked Credit facility 1,860 Undisclosed 2026-03 — other press
CDC Data Centres (Infratil / Future Fund / CSC) Noteholders (not named) A$1.0B subordinated hybrid notes: A$650M 30NC5 FRN and A$350M 30NC7.5 fixed-to-floating — — BondAdviser Weekly Update 2026-06-10 Bond 714.2 A$650M tranche at 3-month BBSW +… 2026-06-04 ~2056 other press
CDC Data Centres (Infratil / Future Fund / CSC) AMTN investors (lead managers not named in accessible sources) A$700M senior secured AMTN, 6-yr and 10-yr fixed tranches — — Allens release 2026-08-10 (not linked) Bond 489.6 6.117% 2026-07-22 ~2032 secured press
Cipher Mining Inc. (renamed Cipher Digital Inc.) CIFR Coinbase Credit, Inc. Coinbase overnight facility — — 10-K 2/24/26 Credit facility 25 Fed funds target upper bound + 2… 2023-08-14 Open / on demand secured confirmed
Cipher Mining Inc. (renamed Cipher Digital Inc.) CIFR Luxor Technology Corporation Luxor bitcoin borrowing (Purchase and Sale Agreement) — — FY24 10-K (origination) Credit facility 9.98 Undisclosed 2024-12-13 2025-03-18 unsecured confirmed
Cipher Mining Inc. (renamed Cipher Digital Inc.) CIFR Registered; Morgan Stanley (representative) 1.75% Convertible Senior Notes due 2030 — — 8-K 5/22/25 Convertible 172.5 1.75% 2025-05-22 2030-05-15 unsecured confirmed
Cipher Mining Inc. (renamed Cipher Digital Inc.) CIFR Two Prime Lending Limited Two Prime facility — — 10-K Credit facility 100 Undisclosed 2025-08-25 Undisclosed secured confirmed
Cipher Mining Inc. (renamed Cipher Digital Inc.) CIFR 144A; U.S. Bank Trust Co. (trustee) 0.00% Convertible Senior Notes due 2031 — — 8-K 10/1/25 Convertible 1,300 0.00% 2025-09-30 2031-10-01 unsecured confirmed
Cipher Mining Inc. (renamed Cipher Digital Inc.) CIFR Morgan Stanley (representative, 144A) +1 7.125% Senior Secured Notes due 2030 — Barber Lake Fluidstack Google backstop Colorado City, Texas 8-K 11/13/25 Bond 1,733 7.125% 2025-11-13 2030-11-15 secured confirmed
Cipher Mining Inc. (renamed Cipher Digital Inc.) CIFR Morgan Stanley (representative) +1 6.125% Senior Secured Notes due 2031 — Black Pearl Amazon Wink, Texas 8-K 2/11/26 Bond 2,000 6.125% 2026-02-11 2031-02-15 secured confirmed
Cipher Mining Inc. (renamed Cipher Digital Inc.) CIFR MS Senior Funding (lead left) +5 Revolving Credit Facility (parent) — — 8-K 3/25/26, credit agreement filed as EX-10.1, acc 0000950103-26-004609 Credit facility 200 SOFR +1.75% 2026-03-23 2030-03-23 secured confirmed
Cipher Mining Inc. (renamed Cipher Digital Inc.) CIFR Morgan Stanley (representative) +1 6.000% Senior Secured Notes due 2031 — Stingray Amazon Andrews, Texas 8-K 6/15/26 Bond 810 6.00% 2026-06-15 2031-06-15 secured confirmed
Cipher Mining Inc. (renamed Cipher Digital Inc.) CIFR 144A; U.S. Bank Trust Co. (trustee); Morgan Stanley and Goldman Sachs (bookrunners, launch presentation) 0.00% Convertible Senior Notes due 2032 — — Closing 8-K 10/16/26 with indenture EX-4.1, acc 0001193125-26-424297 Convertible 850 0.00% 2026-10-16 2032-11-01 unsecured confirmed
CleanSpark, Inc. CLSK Coinbase Credit, Inc. Coinbase Credit bitcoin-backed revolving line of credit (2024 Master Loan) — — CleanSpark Q3 FY2026 10-Q (period ended 2026-06-30), Note 9 Indebtedness, acc 0001193125-26-338382 ("Coinbase line of credit and receivable for bitcoin collateral") Credit facility 200 8.25% 2024-08-07 Open / on demand secured confirmed
CleanSpark, Inc. CLSK 144A QIBs 0% Convertible Senior Notes due 2030 — — Q3 FY2026 10-Q (period ended 2026-06-30), filed 2026-08-06, acc 0001193125-26-338382, Note 9 Indebtedness Convertible 650 0.00% 2024-12-17 2030-06-15 unsecured confirmed
CleanSpark, Inc. CLSK Two Prime Lending Limited Two Prime bitcoin-backed revolving line of credit, up to $100M — — CleanSpark Q3 FY2026 10-Q (period ended 2026-06-30), Note 9 Indebtedness, acc 0001193125-26-338382 ("Two Prime line of credit and receivable for bitcoin collateral") Credit facility 100 SOFR +3.55% 2025-09-19 2026-09-14 secured confirmed
CleanSpark, Inc. CLSK 144A QIBs 0% Convertible Senior Notes due 2032 — — Q3 FY2026 10-Q (period ended 2026-06-30), filed 2026-08-06, acc 0001193125-26-338382, Note 9 Indebtedness Convertible 1,150 0.00% 2025-11-13 2032-02-15 unsecured confirmed
CleanSpark, Inc. CLSK Morgan Stanley & Co. LLC (representative of the initial purchasers, 144A / Reg S) 7.875% Senior Secured Notes due October 1, 2031 (Sandersville GA, 175 MW; priced 9/18, closed 9/25) Meta Sandersville, Georgia release Closing 8-K 9/25/26 (items 1.01, 2.03) and indenture EX-4.1, acc 0001193125-26-402944 Bond 2,276 7.875% 2026-09-25 2031-10-01 secured confirmed
Cloud Capital (Realty Income JV) Guggenheim Securities (sole structuring advisor, sole active bookrunner) +1 Cloud Capital 2024-1 ABS notes, $1.325B (four stabilized data centers) — — Cloud Capital release 2024-12-05 Bond 1,325 5.781% 2024-12-05 2049-11-22 secured confirmed
Cloud Capital (Realty Income JV) Guggenheim Securities (sole structuring advisor, sole active bookrunner) +2 $520M master-trust ABS - 80 MW Northern Virginia hyperscale data center — Ashburn and Sterling, Virginia press Cloud Capital release 7/29/26 Bond 520 5.51% 2026-07-29 2056-07-17 (legal final) secured confirmed
CloudHQ Guggenheim Securities, LLC (structuring agent, per the ABS-15G) +1 $1.4B ABS - two Ashburn hyperscale data centers (first dual-AAA DC ABS) Meta, Microsoft press Ashburn and Sterling, Virginia press +1 SEC Form ABS-15G, Zaft Rudaba LLC (c/o CloudHQ LLC), Ex-99.1 (2026-04-07) Bond 1,400 5.049% Priced ~2026-04 (closed ~end April, press) 2031-04-15 secured confirmed
Cologix (Stonepeak) Deutsche Bank Securities (lead bank; structuring agent per ABS-15G) Scalelogix Secured Data Center Revenue Term Notes, Series 2025-1, $525M (COL4 Columbus) — — Cologix release 2025-07-21 Bond 525 5.673% 2025-07-21 2055-07-25 secured confirmed
Cologix (Stonepeak) Deutsche Bank (lead structuring advisor, lead left active placement agent) +2 Cologix US Secured Data Center Revenue Term Notes, Series 2026-1 and 2026-2, $1.351B — — IGM US Structured Finance Monitor Weekly 2026-02-06, ABS Priced (press) Bond 1,351 Undisclosed 2026-02-02 2058-02 secured confirmed
Cologix (Stonepeak) La Caisse (sole lender) CAD 240M senior financing, MTL8 data center, Montreal (La Caisse) — — Cologix release 2026-03-05 Credit facility 176.2 Undisclosed 2026-03-05 — other confirmed
Compass Datacenters Guggenheim Securities (structuring agent, ABS-15G) Series 2025-1 (A2, A3) and 2025-2 (A2) ABS notes, $885M, first Issuer III issuance — — Form ABS-15G, Compass Datacenters, LLC (issuing entities Compass Datacenters Issuer III, LLC and Compass Datacenters Canada Issuer III Limited Partnership), acc 0001193125-25-018463, 2025-01-31, Ex. 99.1 KPMG agreed-upon procedures report Bond 885 5.656% 2025-02 2050-02-25 secured confirmed
Compass Datacenters Guggenheim Securities (structuring agent, ABS-15G) Series 2025-3 ABS notes (Issuer III; size not disclosed) — — ABS-15G, Compass Datacenters, LLC, acc 0001193125-25-154697 (2025-07-02) Bond — 5.286% 2025-07 2050-07-25 secured confirmed
Compass Datacenters Guggenheim Securities (structuring agent, ABS-15G) +2 Series 2025-2 Class A-1 ABS notes, $326M (five Red Oak, TX buildings) — — Form ABS-15G, Compass Datacenters A, LLC (issuing entity Compass Datacenters Issuer II, LLC), acc 0001193125-25-248909, 2025-10-23, Ex. 99.1 KPMG agreed-upon procedures report Bond 326 4.926% 2025-10 2050-11-25 secured confirmed
Compass Datacenters Bookrunners not named in press coverage Series 2026-1 ABS, ~$830M (six hyperscale data centers, Phoenix and Toronto) — Phoenix, Arizona press +1 Bisnow 2026-02-10 (Moody's presale figures) Bond 830 4.897% 2026-02 2031-02 secured confirmed
Compass Datacenters Bookrunners not named in press coverage +1 Series 2026-2 ABS notes, $413M in three tranches — — DCD 7/27/26 (press) Bond 413 5.715% 2026-07-27 2056-07-25 secured confirmed
Core Scientific, Inc. CORZ Lessors (not named) Finance leases — — Q2-26 10-Q Note 6 Leases, filed 2026-07-28, acc 0001839341-26-000014 Lease 1.92 Undisclosed — Various other confirmed
Core Scientific, Inc. CORZ 144A; U.S. Bank Trust Co. (trustee) 3.00% Convertible Senior Notes due 2029 — — 8-K 8/19/24 Convertible 460 3.00% 2024-08-19 2029-09-01 unsecured confirmed
Core Scientific, Inc. CORZ 144A; U.S. Bank Trust Co. (trustee) 0.00% Convertible Senior Notes due 2031 — — 8-K 12/5/24 Convertible 625 0.00% 2024-12-05 2031-06-15 unsecured confirmed
Core Scientific, Inc. CORZ Morgan Stanley Senior Funding, Inc. (admin + collateral agent; initial $500M) +1 Delayed-Draw Bridge Credit Agreement ($1.0B 364-day, MS/JPM) — — 8-K 3/6/26 (origination) Credit facility 1,000 SOFR +2.50% 2026-03-04 2027-03-03 secured confirmed
Core Scientific, Inc. CORZ Morgan Stanley (lead) +2 7.750% Senior Secured Notes due 2031 CoreWeave Austin, Texas +5 8-K 5/6/26 with indenture Bond 3,300 7.75% 2026-05-06 2031-05-15 secured confirmed
Core Scientific, Inc. CORZ JPMorgan Chase Bank, N.A. (admin + collateral agent; $25M revolver, $125M L/C) +3 JPMorgan Revolving Credit + Letter of Credit Facility — — 8-K 8/27/26 (Credit Agreement filed as EX-10.1) Credit facility 600 SOFR +1.75% 2026-08-25 2029-08-25 secured confirmed
Core Scientific, Inc. CORZ — Planned project-level bonds for the AMD and Neocloud build-out — — Q3-26 10-Q Note 10 (Liquidity), Note 6 (AMD Leases) and MD&A Liquidity, acc 0001839341-26-000030 Bond — Undisclosed Planned (Q3-26 10-Q, 2026-11-05) Undisclosed other confirmed
Csquare, Inc. (Centersquare) CSQR Wells Fargo Bank, N.A. (administrative agent and collateral agent) +1 2024 Revolving Credit Facility, $800M (Wells Fargo agent) — — Csquare, Inc. Q2-26 10-Q (acc 0002105398-26-000004) Notes 9 and 17 Credit facility 800 SOFR +3.00% 2024-01-12 2026-12 secured confirmed
Csquare, Inc. (Centersquare) CSQR Wells Fargo Bank, N.A. (lender) +1 2024 Term Loan, $1.999B two-year (Wells Fargo, TD; repaid) — — Csquare, Inc. Q2-26 10-Q (acc 0002105398-26-000004) Note 9 Credit facility 1,999 SOFR +3.75% 2024-01-12 2026-01 other confirmed
Csquare, Inc. (Centersquare) CSQR Affiliates of TD Securities, BMO Capital Markets and Scotia Capital (VFN holders, per 424B4) +1 Series 2024-1 Secured Data Center Revenue Variable Funding Notes, $100M revolving — — Csquare, Inc. 424B4 2026-07-16 (acc 0001104659-26-084293), MD&A Debt and Use of Proceeds Credit facility 100 SOFR +2.45% 2024-10-17 2054-10 secured confirmed
Csquare, Inc. (Centersquare) CSQR TD Securities, Wells Fargo Securities (specified parties in the ABS-15G accountants' report) +2 Secured Data Center Revenue Term Notes, Series 2024-1 and 2024-2, $885M — — Csquare, Inc. 424B4 2026-07-16 (acc 0001104659-26-084293), debt section and Note 10 Bond 885 5.20% 2024-10-17 2054-10 secured confirmed
Csquare, Inc. (Centersquare) CSQR Csquare's Parent (related party) $646.0M related-party bridge loan from the Parent (March 2025; repaid) — — Csquare, Inc. Q2-26 10-Q (acc 0002105398-26-000004) Note 14 Other 646 Undisclosed 2025-03-11 — other confirmed
Csquare, Inc. (Centersquare) CSQR Wells Fargo Securities (lead structuring advisor, press) +3 Secured Data Center Revenue Term Notes, Series 2025-1 and 2025-2, $940M — — Csquare, Inc. 424B4 2026-07-16 (acc 0001104659-26-084293), debt section and Notes 10 and related-party bridge loan Bond 940 5.50% 2025-03-20 2055-03 secured confirmed
Csquare, Inc. (Centersquare) CSQR TD Securities (lead structuring advisor, press) +3 Secured Data Center Revenue Term Notes, Series 2025-3 and 2025-4, $815M — — Csquare, Inc. 424B4 2026-07-16 (acc 0001104659-26-084293), debt section and Note 10 Bond 815 5.00% 2025-08-21 2055-08 secured confirmed
Csquare, Inc. (Centersquare) CSQR Wilmington Trust, N.A. (trustee) Assumed 2021 Indenture ABS notes (Series 2020-2, 2021-1, 2022-1), $523M — — Csquare, Inc. Q2-26 10-Q (acc 0002105398-26-000004) Notes 9 and 17 Bond 523 2.50% 2025-10-01 (assumed; series issued 2020 to 2022) 2052-04 secured confirmed
Csquare, Inc. (Centersquare) CSQR Wilmington Trust, N.A. (trustee) Assumed Series 2020-1 ABS notes, 2021 Indenture, $220.0M (repaid) — — Csquare, Inc. Q2-26 10-Q (acc 0002105398-26-000004) Note 9 Bond 220 Undisclosed 2025-10-01 (assumed; series issued 2020) — secured confirmed
Csquare, Inc. (Centersquare) CSQR Scotia Capital, TD Securities, Wells Fargo Securities, BMO Capital Markets (specified parties in the ABS-15G accountants' report; Scotia delivered the data file) +2 Secured Data Center Revenue Term Notes, Series 2025-5, 2025-6 and 2025-7, $1.1B — — Csquare, Inc. 424B4 2026-07-16 (acc 0001104659-26-084293), debt section and Note 10 Bond 1,100 5.30% 2025-12-04 2055-12 secured confirmed
Csquare, Inc. (Centersquare) CSQR Affiliate of the Parent (related party, per the 10-Q) $75M 3.54% unsecured promissory note due 2029 (related party; repaid) — — Csquare, Inc. Q2-26 10-Q (acc 0002105398-26-000004) Notes 14 and 17 Other 75 3.54% 2026-05-14 2029-05-14 unsecured confirmed
CW Nest Property Owner LLC (CoreWeave Kenilworth JV) GLAS USA LLC (administrative and collateral agent) +2 $555M delayed draw term loan, 11 NEST data-center conversion (Kenilworth, NJ) CoreWeave — Union County, NJ mortgage, Inst# 85039, Book 15718 Page 2328 (dated 2025-11-03, recorded 2025-11-10) Credit facility 555 SOFR +3.75% 2025-11-03 2028-11 secured confirmed
CyrusOne (KKR / GIP) Citigroup Global Markets (structuring agent) +1 Series 2024-2 and 2024-3 Class A-2 green ABS notes, $1.175B — — CyrusOne release 2024-05-15 Bond 1,175 4.50% 2024-05-15 2049-05-20 secured confirmed
CyrusOne (KKR / GIP) Morgan Stanley (lead manager, bookrunner) +1 $687.1M single-asset single-borrower CMBS loan, DFW1 Carrollton TX (CONE Trust 2024-DFW1) — — CyrusOne release 2024-07-15 Bond 687.1 SOFR +1.64% 2024-07-15 2041-08-15 (certificate legal final) secured confirmed
CyrusOne (KKR / GIP) MUFG Securities Americas (structuring agent, ABS-15G) +1 Series 2025-1 Class A-2 ABS, $575M (13 data centers in Northern Virginia, San Antonio and Houston) — — Form ABS-15G, CyrusOne LP (issuing entity CyrusOne Data Centers Issuer I LLC), acc 0001193125-25-011925, 2025-01-24, Ex. 99.1 KPMG agreed-upon procedures report dated 2025-01-22 Bond 575 5.91% 2025-02 ~2030 secured confirmed
CyrusOne (KKR / GIP) Banking and institutional lending partners (not named in release) Revolving Credit Facility, about $3.8B (upsized and extended March 2026) — — CyrusOne release 2026-03-24 Credit facility 3,800 Undisclosed 2026-03-24 (upsize and extension; original signing date not in the release) — other confirmed
CyrusOne (KKR / GIP) Banking and institutional lending partners (not named in release) U.S. Term Loan, $4.2B (upsized and extended March 2026) — — CyrusOne release 2026-03-24 Credit facility 4,200 Undisclosed 2026-03-24 (upsize and extension; original signing date not in the release) — other confirmed
CyrusOne (KKR / GIP) Wells Fargo Bank, Barclays Capital Real Estate, Citi Real Estate Funding, Goldman Sachs, Morgan Stanley (loan sellers, press) +1 $1.05B single-asset single-borrower CMBS loan, DFW3 and DFW4, Allen TX (CONE 2026-DFW3) — — Kirkland & Ellis release 2026-05-20 Bond 1,050 5.751% 2026-05-20 ~2031 secured confirmed
DATA4 (Brookfield) Societe Generale (underwriter, bookrunner, senior mandated lead arranger and hedge provider, per its own client note) +1 EUR 3.3B financing: EUR 2.2B StableCo term debt + EUR 1.1B incremental GrowthCo capex facility — — DATA4 press release (PDF on data4group.com), Paris, 2025-01-28 Credit facility 3,365 Undisclosed 2025-01-13 — other confirmed
DataBank Deutsche Bank Securities (sole structuring agent, joint active bookrunner) +2 Series 2024-1 Secured Data Center Revenue Term Notes, $456M (green) — — DataBank release 2024-02-15 (PR Newswire) Bond 456 5.30% 2024-02-15 — secured confirmed
DataBank Deutsche Bank Securities (structuring agent, joint active bookrunner) +2 $1.07B hyperscale master-trust securitization (green) — Atlanta, Georgia release +2 DataBank release 9/24/25 Bond 1,067 5.18% 2025-09-24 2055-09-27 (legal final) secured confirmed
DataBank TD Securities (administrative agent, joint lead arranger and joint bookrunner) +2 $1.6B green development credit facility (upsized from $725M; TD agent) — — DataBank release 2025-10-17 (PR Newswire) Credit facility 1,600 Undisclosed 2025-10-17 — other confirmed
DataBank Guggenheim Securities (specified party, ABS-15G) Series 2026-1 ABS, $665M (36 colocation data centers, 14 U.S. markets) — — Form ABS-15G, DataBank Holdings Ltd. (issuing entity DataBank Issuer, LLC), acc 0001140361-26-000486, 2026-01-07, Ex. 99.1 Deloitte agreed-upon procedures report dated 2026-01-05 (same exhibit in acc 0001140361-26-000488) Bond 665 5.811% 2026-01 — secured confirmed
DataBank MUFG Bank, Ltd. (administrative agent, coordinating lead arranger and sole bookrunner of the bank syndicate from the April 2026 announcement) +4 $2.65B Red Oak campus construction financing (upsized from $2.0B) Oracle Red Oak, Texas press +1 DataBank release 2026-06-15 (PRNewswire). DataBank release 2026-04-21 (PR Newswire) for the original $2.0B loan. Credit facility 2,650 Undisclosed 2026-04-21 2031-03-06 other confirmed
DataBank Citizens Bank, N.A. (lead) +1 $800M corporate revolving credit facility due 2031 (Citizens lead) — — DataBank release 2026-06-15 (PR Newswire) Credit facility 800 Undisclosed 2026-06-15 2031 other confirmed
DayOne Data Centers Not named in the F-1 Hong Kong term loan, 3M HIBOR + 1.62%, due 2027 — — DayOne Data Centers Limited Form F-1 (2026-10-05), interim Note 6 Borrowings (long-term borrowings at 2026-06-30 and 2025-12-31) and MD&A, Other Loan Facilities Credit facility 193.4 3-month HIBOR + 1.62% 2022 2027 other confirmed
DayOne Data Centers Not named in the F-1 Hong Kong term loan, 3M HIBOR + 1.975%, due 2027 — — DayOne Data Centers Limited Form F-1 (2026-10-05), interim Note 6 Borrowings (long-term borrowings at 2026-06-30 and 2025-12-31) and MD&A, Other Loan Facilities Credit facility 202.3 3-month HIBOR + 1.975% 2023 2027 other confirmed
DayOne Data Centers Not named in the F-1 Indonesia term loan, IndONIA + 2.75%, due 2031 — — DayOne Data Centers Limited Form F-1 (2026-10-05), interim Note 6 Borrowings (long-term borrowings at 2026-06-30 and 2025-12-31) and MD&A, Other Loan Facilities Credit facility 297.3 IndONIA + 2.75% 2025 2031 other confirmed
DayOne Data Centers Not named in the F-1 Mezzanine debt, 9.75% fixed, due 2032 — — DayOne Data Centers Limited Form F-1 (2026-10-05), interim Note 6 Borrowings (long-term borrowings at 2026-06-30 and 2025-12-31) and MD&A, Other Loan Facilities Credit facility 249.2 9.75% 2025 2032 other confirmed
DayOne Data Centers Maybank Investment Bank Berhad (party to the common terms agreement, F-1 Ex. 10.8) +3 Johor Loan Facilities I: US$1.7B offshore term loan and MYR 7.5B Murabahah term facility (green) — — DayOne Data Centers Limited Form F-1 (2026-10-05), Indebtedness: Johor Loan Facilities I Credit facility 3,500 SOFR +2.20% 2025-05-15 ~2030 secured confirmed
DayOne Data Centers Not named in the F-1 Thailand term loan, 3M THOR + 2.70%, due 2030 — — DayOne Data Centers Limited Form F-1 (2026-10-05), interim Note 6 Borrowings (long-term borrowings at 2026-06-30 and 2025-12-31) and MD&A, Other Loan Facilities Credit facility 207.6 3-month THOR + 2.70% 2026 2030 other confirmed
DayOne Data Centers Not named in the F-1 Finland term loan, EURIBOR + 2.50%, due 2028 — — DayOne Data Centers Limited Form F-1 (2026-10-05), interim Note 6 Borrowings (long-term borrowings at 2026-06-30 and 2025-12-31) and MD&A, Other Loan Facilities Credit facility 116.4 EURIBOR + 2.50% 2026 2028 other confirmed
DayOne Data Centers Not named in the F-1 Hong Kong term loan, 3M HIBOR + 2.00%, due 2029 — — DayOne Data Centers Limited Form F-1 (2026-10-05), interim Note 6 Borrowings (long-term borrowings at 2026-06-30 and 2025-12-31) and MD&A, Other Loan Facilities Credit facility 44 3-month HIBOR + 2.00% 2026 2029 other confirmed
DayOne Data Centers Not named in the F-1 Term loan, TIBOR + 2.50%, due 2027 — — DayOne Data Centers Limited Form F-1 (2026-10-05), interim Note 6 Borrowings (long-term borrowings at 2026-06-30 and 2025-12-31) and MD&A, Other Loan Facilities Credit facility 49.9 TIBOR + 2.50% 2026 2027 other confirmed
DayOne Data Centers DBS (joint MLA, bookrunner, green loan coordinator; facility and security agent) +2 S$530M green term loan facilities, 20 MW Jalan Buroh data center (Singapore) — — w.media, August 2026 (DayOne green loan from DBS, OCBC and UOB), citing the banks' release, linked Credit facility 414.7 Undisclosed 2026-08-11 ~2030 other confirmed
DayOne Data Centers Maybank Investment Bank Berhad (party to the amendment and restatement deeds, F-1 Ex. 10.8 to 10.11) +1 Johor Loan Facilities I upsize: +US$2.4B offshore term loan and +MYR 5.5B Murabahah (amended and restated 2026-09-10) — — DayOne Data Centers Limited Form F-1 (2026-10-05), Johor Loan Facilities I and Ex. 10.8 to 10.11 Credit facility 3,700 SOFR +2.20% 2026-09-10 — secured confirmed
DayOne Data Centers In talks: DBS, OCBC and UOB (press) About HK$1.86B (US$237M) five-year loan, Kwai Chung data center, Hong Kong (sought) — — Bloomberg via w.media, August 2026 (DayOne seeks US$240 million loan for Hong Kong data center) Credit facility 237.2 Undisclosed Reported 2026-08-21; not signed Undisclosed other rumored
DDSP CTBC Bank (MLA, underwriter, bookrunner) +3 US$283M green financing, 45 MW built-to-suit hyperscale campus, Sedenak Tech Park (Johor) — — Developing Telecoms 2026-06-01 Credit facility 283 Undisclosed 2026-06 — other press
Digi Power X Inc. DGXX Goldman Sachs (syndication, press) +1 $200M debt financing commitment, Columbiana, AL AI data center (Goldman Sachs syndication) — — DCD 'Digi Power X secures $200m in debt financing for Alabama data center project' (2026-10-14) Credit facility 200 Undisclosed Reported 2026-10-14 — other press
Digital Drive project (PowerHouse Data Centers / Chirisa Technology Parks; Blue Owl equity) Goldman Sachs (lead, press) +2 $1.1B five-year notes (priced 9/23; CoreWeave lease) CoreWeave press Chesterfield County, Virginia press Bloomberg 'CoreWeave-Tied Data Center Raises $1.1 Billion in Junk Bonds' (2026-09-23, via briefs.co) Bond 1,100 8.875% 2026-09-23 2031-09-30 other press
Digital Edge (Stonepeak) Korean and international financial institutions (not named) KRW 800B green loan, SEL3 (60 MW), Bupyeong-gu, Incheon — — Digital Edge release 2025-07-10 Credit facility 582.6 Undisclosed 2025-07-10 — other confirmed
Digital Edge (Stonepeak) BNP Paribas, Clifford Capital, Crédit Agricole CIB, DBS, Mizuho, OCBC, PT Bank Central Asia Tbk, SMBC (mandated lead arrangers) +1 US$665M green loan, CGK Campus phase 1 (Bekasi, Indonesia) — — Milbank release 2026-03-20 (not linked) Credit facility 665 Undisclosed 2026-03-16 — other confirmed
Digital Realty Trust, Inc./L.P. DLR Not named Other unsecured loan — — FY25 10-K Note 10 Credit facility 18.2 11.65–14.50% — Not stated unsecured confirmed
Digital Realty Trust, Inc./L.P. DLR Not named Westin Building Exchange mortgage (Seattle) — Seattle, Washington FY25 10-K Note 10 Credit facility 135 3.29% 2017-06-29 2027-07-11 secured confirmed
Digital Realty Trust, Inc./L.P. DLR Noteholders 3.300% GBP notes due 2029 — — 10-Q Q2 2026 (Note 8, Debt of the Operating Partnership) Bond 464.2 3.30% 2017-07 2029-07-19 unsecured confirmed
Digital Realty Trust, Inc./L.P. DLR Noteholders 3.700% USD notes due 2027 — — 10-Q Q2 2026 (Note 8, Debt of the Operating Partnership) Bond 1,000 3.70% 2017-08 2027-08-15 unsecured confirmed
Digital Realty Trust, Inc./L.P. DLR Noteholders 4.450% USD notes due 2028 — — 10-Q Q2 2026 (Note 8, Debt of the Operating Partnership) Bond 650 4.45% 2018-06 2028-07-15 unsecured confirmed
Digital Realty Trust, Inc./L.P. DLR Noteholders 3.750% GBP notes due 2030 — — 10-Q Q2 2026 (Note 8, Debt of the Operating Partnership) Bond 729.4 3.75% 2018-10 2030-10-17 unsecured confirmed
Digital Realty Trust, Inc./L.P. DLR Noteholders 3.600% USD notes due 2029 — — 10-Q Q2 2026 (Note 8, Debt of the Operating Partnership) Bond 900 3.60% 2019-06 2029-07-01 unsecured confirmed
Digital Realty Trust, Inc./L.P. DLR Noteholders 1.125% EUR notes due 2028 — — 10-Q Q2 2026 (Note 8, Debt of the Operating Partnership) Bond 571.1 1.125% 2019-10 2028-04-09 unsecured confirmed
Digital Realty Trust, Inc./L.P. DLR Noteholders 1.500% EUR notes due 2030 — — 10-Q Q2 2026 (Note 8, Debt of the Operating Partnership) Bond 856.6 1.50% 2020-01 2030-03-15 unsecured confirmed
Digital Realty Trust, Inc./L.P. DLR Noteholders 1.250% EUR notes due 2031 — — 10-Q Q2 2026 (Note 8, Debt of the Operating Partnership) Bond 571.1 1.25% 2020-06 2031-02-01 unsecured confirmed
Digital Realty Trust, Inc./L.P. DLR Noteholders 1.000% EUR notes due 2032 — — 10-Q Q2 2026 (Note 8, Debt of the Operating Partnership) Bond 856.6 1.00% 2020-09 2032-01-15 unsecured confirmed
Digital Realty Trust, Inc./L.P. DLR Noteholders 0.625% EUR notes due 2031 — — 10-Q Q2 2026 (Note 8, Debt of the Operating Partnership) Bond 1,142 0.625% 2021-01 2031-07-15 unsecured confirmed
Digital Realty Trust, Inc./L.P. DLR Reg S noteholders 0.200% CHF notes due 2026 — — 10-Q Q2 2026 (Note 8, Debt of the Operating Partnership) Bond 340.2 0.20% 2021-07 2026-12-15 unsecured confirmed
Digital Realty Trust, Inc./L.P. DLR Reg S noteholders 0.550% CHF notes due 2029 — — 10-Q Q2 2026 (Note 8, Debt of the Operating Partnership) Bond 334 0.55% 2021-07 2029-04-16 unsecured confirmed
Digital Realty Trust, Inc./L.P. DLR Noteholders 1.375% EUR notes due 2032 — — 10-Q Q2 2026 (Note 8, Debt of the Operating Partnership) Bond 856.6 1.375% 2022-01 2032-07-18 unsecured confirmed
Digital Realty Trust, Inc./L.P. DLR Reg S noteholders 1.700% CHF notes due 2027 — — 10-Q Q2 2026 (Note 8, Debt of the Operating Partnership) Bond 185.6 1.70% 2022-03 2027-03-30 unsecured confirmed
Digital Realty Trust, Inc./L.P. DLR Syndicate; Citibank (admin) Euro Term Loan — — 10-Q Q3 2026 (Note 9, Debt of the Operating Partnership) Credit facility 424.9 weighted average 3.08% (term loa… 2022-08-11 2027-08-11 unsecured confirmed
Digital Realty Trust, Inc./L.P. DLR Noteholders 5.550% USD notes due 2028 — — 10-Q Q2 2026 (Note 8, Debt of the Operating Partnership) Bond 900 5.55% 2022-09 2028-01-15 unsecured confirmed
Digital Realty Trust, Inc./L.P. DLR Noteholders 3.875% EUR notes due 2033 — — 10-Q Q2 2026 (Note 8, Debt of the Operating Partnership) Bond 970.9 3.875% 2024-09 2033-09-13 unsecured confirmed
Digital Realty Trust, Inc./L.P. DLR Syndicate; Citibank (admin) Global Revolving Credit Facility (multicurrency) — — 10-Q Q3 2026 (Note 9, Debt of the Operating Partnership) Credit facility 4,200 Index + 77.5 bps 2024-09-24 2029-01-24 unsecured confirmed
Digital Realty Trust, Inc./L.P. DLR SMBC (admin), Mizuho, MUFG Yen Revolving Facility — — 8-K Sep 30, 2024 Credit facility 270 TIBOR + 45 bps 2024-09-24 2029-01-24 unsecured confirmed
Digital Realty Trust, Inc./L.P. DLR U.S. Bank (trustee) 1.875% Exchangeable Senior Notes due 2029 — — 10-Q Q2 2026 (Note 8, Debt of the Operating Partnership) Convertible 1,150 1.875% 2024-11-12 2029-11-15 unsecured confirmed
Digital Realty Trust, Inc./L.P. DLR Noteholders 3.875% EUR notes due 2035 — — 10-Q Q2 2026 (Note 8, Debt of the Operating Partnership) Bond 970.9 3.875% 2025-01 2035-03-15 unsecured confirmed
Digital Realty Trust, Inc./L.P. DLR Noteholders 3.875% EUR notes due 2034 — — 10-Q Q2 2026 (Note 8, Debt of the Operating Partnership) Bond 970.9 3.875% 2025-06 2034-07-15 unsecured confirmed
Digital Realty Trust, Inc./L.P. DLR Noteholders 3.750% EUR notes due 2033 — — 10-Q Q2 2026 (Note 8, Debt of the Operating Partnership) Bond 685.3 3.75% 2025-11 2033-01-15 unsecured confirmed
Digital Realty Trust, Inc./L.P. DLR Noteholders 4.250% EUR notes due 2037 — — 10-Q Q2 2026 (Note 8, Debt of the Operating Partnership) Bond 913.8 4.25% 2025-11 2037-11-20 unsecured confirmed
Digital Realty Trust, Inc./L.P. DLR Not named Assumed construction loan (Carver JVs) — Ashburn and Sterling, Virginia +2 Q2-26 10-Q, OP debt note fn (2) + Investments in Properties note (acc 0001104659-26-089296) Credit facility 725.6 Undisclosed 2026-06-30 2027-12-24 secured confirmed
Digital Realty Trust, Inc./L.P. DLR Noteholders (UBS, Deutsche Bank managers) 1.6803% CHF notes due 2029 — — 8-K 2026-10-06 Items 1.01/2.03 + EX-4.1 Terms and Conditions + EX-4.2 to EX-4.4 (acc 0001193125-26-415814) Bond 278.3 1.68% 2026-10-06 2029-10-08 unsecured confirmed
Digital Realty Trust, Inc./L.P. DLR Noteholders (UBS, Deutsche Bank managers) 2.0600% CHF notes due 2032 — — 8-K 2026-10-06 Items 1.01/2.03 + EX-4.1 Terms and Conditions + EX-4.2 to EX-4.4 (acc 0001193125-26-415814) Bond 228.9 2.06% 2026-10-06 2032-10-06 unsecured confirmed
Digital Realty Trust, Inc./L.P. DLR Noteholders (UBS, Deutsche Bank managers) 2.4150% CHF notes due 2036 — — 8-K 2026-10-06 Items 1.01/2.03 + EX-4.1 Terms and Conditions + EX-4.2 to EX-4.4 (acc 0001193125-26-415814) Bond 123.7 2.415% 2026-10-06 2036-10-06 unsecured confirmed
Digital Realty Trust, Inc./L.P. DLR Noteholders 5.125% EUR notes due 2036 — — 8-K 2026-10-09 Items 1.01/2.03 + EX-4.1 indenture (acc 0001193125-26-419168) Bond 1,142 5.125% 2026-10-09 2036-10-09 unsecured confirmed
Digital Realty Trust, Inc./L.P. DLR Not named Teraco debt facilities — Ekurhuleni, South Africa release +4 FY25 10-K Note 10 Credit facility 657.3 Undisclosed Assumed with Teraco stake Several loans, 2026 to 2030 secured confirmed
Echelon Data Centres (Starwood Capital) Morgan Stanley (mandated lead arranger) +1 EUR 900M debt facility from Morgan Stanley and UOB (February 2024) — — Starwood Capital release 2024-02-15 (PR Newswire) Credit facility 966.9 Undisclosed 2024-02-15 — other confirmed
Echelon Data Centres (Starwood Capital) Morgan Stanley EUR 1.7B initial loan financing from Morgan Stanley (European platform) — — Irish Times 2026-02-24 Credit facility 2,002 Undisclosed 2026-02-24 — other press
EcoDataCenter (Areim) Deutsche Bank Private Credit and Infrastructure EUR 600M debt financing (Deutsche Bank Private Credit and Infrastructure) CoreWeave — EcoDataCenter release 2025-09-09 (Mynewsdesk) Credit facility 704.6 Undisclosed 2025-09-09 — other confirmed
EdgeCore Digital Infrastructure MUFG (coordinating lead arranger, administrative agent) +4 $1.9B Mesa campus green loan: limited-recourse senior secured term loan + LC facility — — EdgeCore release 2024-01-04 (PR Newswire) Credit facility 1,900 Undisclosed 2024-01-04 — secured confirmed
EdgeCore Digital Infrastructure MUFG Bank (coordinating lead arranger and bookrunner; administrative agent, press) +2 $440M limited-recourse senior secured green term loan, Silicon Valley (Santa Clara) campus — — EdgeCore release 2024-03-13 ('EdgeCore Digital Infrastructure Announces Second Debt Financing Transaction of 2024') Credit facility 440 Undisclosed 2024-03-13 — secured confirmed
EdgeCore Digital Infrastructure MUFG (structuring agent, bookrunner) +2 Secured Data Center Revenue Term Notes, Series 2025-1 (Class A-2 + Class B): $235M green ABS on PH01 — — EdgeCore release 2025-07-24 Bond 235 4.45% 2025-07-24 2030-07-25 secured confirmed
EdgeCore Digital Infrastructure Apterra Infrastructure Capital, LLC (coordinating lead arranger; administrative agent) +2 AS01 + AS02 construction financing - $1.5B limited-recourse term loans — Ashburn and Sterling, Virginia press +1 EdgeCore release 2026-04-21 Credit facility 1,500 Undisclosed 2026-04-21 Undisclosed secured confirmed
EdgeCore Digital Infrastructure MUFG (sole structuring advisor, joint bookrunner) +3 Secured data center revenue term notes: $521M green ABS on SV01 (Santa Clara) — — EdgeCore release 2026-10-28 (via Black Ridge Research and citybiz) Bond 521 Undisclosed 2026-10-28 — secured confirmed
eStruxture Data Centers (Fengate) Guggenheim Securities (lead structuring advisor) +2 Secured Data Center Revenue Term Notes, Series 2025-1: C$750M green ABS — — eStruxture release 2025-07-30 Bond 543.1 5.894% 2025-07-30 — secured confirmed
eStruxture Data Centers (Fengate) Scotiabank (underwriter) +1 C$300M DevCo revolving credit facility (C$600M with accordion) — — eStruxture release 2025-07-30 Credit facility 217.2 Undisclosed 2025-07-30 — other confirmed
eStruxture Data Centers (Fengate) Guggenheim Securities (sole structuring advisor, sole placement agent) C$150M ABS upsize (green), second issuance from the eStruxture program — — eStruxture release 2026-03-25 Bond 108.7 Undisclosed 2026-03-25 — secured confirmed
Fermi Inc. FRMI Seed noteholders (not named) Seed Convertible Notes ($26.1M, 15% PIK; converted Aug 2025) — — Fermi FY2025 10-K Note 7, acc 0002071778-26-000010 (Seed Convertible Notes) and Note 3 Convertible 26.1 15.00% 2025-05 2030-05 unsecured confirmed
Fermi Inc. FRMI Series A noteholders (not named) Series A Convertible Notes ($75.5M, 15% PIK, turbine-secured; converted Aug 2025) — — Fermi FY2025 10-K Note 7, acc 0002071778-26-000010 (Series A Convertible Notes) and Note 3 Convertible 75.5 15.00% 2025-06 2030-06 unsecured confirmed
Fermi Inc. FRMI MAD Energy Limited Partnership (seller and noteholder) Series B Convertible Secured Note ($145.0M, 11% PIK, Firebird acquisition; converted Aug 2025) — — Fermi FY2025 10-K Note 7, acc 0002071778-26-000010 (Series B Convertible Note Convertible 145 11.00% 2025-07-29 2026-01-31 secured confirmed
Fermi Inc. FRMI Macquarie Equipment Capital (lender) Macquarie Term Loan ($100M senior secured bridge loan, Siemens turbine obligations) — — Fermi 10-K FY2025, Note 7 (acc 0002071778-26-000010) Credit facility 100 1.00% 2025-08-29 2026-08-29 secured confirmed
Fermi Inc. FRMI MUFG Bank, Ltd. (administrative agent; sole lender at signing; a lender syndicate since the Oct 2026 amendment) Turbine Warehouse Equipment Financing (MUFG) — Carson County, Texas 8-K 2/10/26, agreement filed as EX-10.1, acc 0001213900-26-014270 Credit facility 500 SOFR +4.00% 2026-02-10 2027-08-10 secured confirmed
Fermi Inc. FRMI Keystone National Group, LLC (agent) +2 High Voltage Equipment Financing (Keystone Master Loan Agreement) — Carson County, Texas 8-K 2/25/26, master loan agreement filed as EX-10.1, acc 0001213900-26-020399 Credit facility 120 12.90% 2026-02-19 2031-08-19 secured confirmed
Fermi Inc. FRMI Beal Bank USA (lender) +1 Turbine Warehouse II Equipment Financing (Beal Credit Agreement, CLMG as agent) — Carson County, Texas 8-K 3/27/26, agreement filed as EX-10.1, acc 0001213900-26-035482 Credit facility 165 12.00% 2026-03-26 2028-12 secured confirmed
Fermi Inc. FRMI YA II PN, Ltd. (Yorkville Advisors Global, LP) Senior unsecured promissory note (Yorkville, up to $156.25M committed, stepping down) — — Q2-26 10-Q filed 2026-08-14, acc 0002071778-26-000051, debt note (Promissory Note) Credit facility 156.3 0.00% 2026-03-30 2027-09-30 unsecured confirmed
Fermi Inc. FRMI 144A; U.S. Bank Trust Co. (trustee) 5.00% Convertible Senior Notes due 2031 — — 8-K, Items 1.01, 2.03 and 3.02 (event 2026-07-09, filed 2026-07-15), acc. 0001213900-26-078366 Convertible 431.3 5.00% 2026-07-14 2031-07-15 unsecured confirmed
Flash Compute LLC (Abernathy JV) Morgan Stanley (representative) +1 7.250% Senior Secured Notes due 2030 (Flash Compute JV) Fluidstack Google backstop Abernathy, Texas 8-K 12/29/25 Bond 1,300 7.25% 2025-12-29 2030-12-31 secured confirmed
Fleet Data Centers (Tract Capital) Initial purchasers not named (Cahill Gordon & Reindel represented them) 5.875% Senior Secured Notes due 2031 (SV RNO, Storey County, NV) Nvidia press — Fleet Data Centers pricing release 2026-02-13 Bond 3,800 5.875% 2026-02-13 2031-03-01 secured confirmed
Fleet Data Centers (Tract Capital) Initial purchasers not named (Cahill Gordon & Reindel represented them) 6.500% Senior Secured Notes due 2031 (PR RNO, Storey County, NV) Nvidia press — Fleet Data Centers pricing release 2026-04-28 and closing release 2026-05-01 Bond 4,585 6.50% 2026-04-28 2031-05-01 secured confirmed
Flexential (GI Partners) Initial purchasers not named in accessible sources Secured Data Center Revenue Term Notes, Series 2025-1 + 2025-2 ($800M green ABS) — — Simpson Thacher release 2025-11-24 Bond 800 6.03% 2025-11-13 ~2030-10 secured confirmed
Flexential (GI Partners) Deutsche Bank Securities (structuring agent, ABS-15G) Secured Data Center Revenue Term Notes, 2026 series (about $1.4B ABS incl. variable funding notes) — — Form ABS-15G, Flexential Corp. (issuing entity Flexential Issuer, LLC acc 0001140361-26-006248 Bond 1,400 6.00% 2026-03 2031-03-25 secured confirmed
Flexential (GI Partners) TD Securities (administrative agent, joint coordinating lead arranger, joint bookrunner) +3 $800M development credit facility (TD agent; upsized from $500M target) — — Flexential release 2026-08-18 (PR Newswire) Credit facility 800 Undisclosed 2026-08-18 — other confirmed
Galaxy Digital Inc. GLXY Note purchasers (private placement with transfer restrictions) 3.00% Exchangeable Senior Notes due 2026 — — Galaxy Q2-26 10-Q, Note 16 Loans and Notes Payable, acc 0001859392-26-000091 Convertible 500 3.00% 2021-12-09 2026 unsecured confirmed
Galaxy Digital Inc. GLXY Note purchasers (private placement with transfer restrictions) 2.500% Exchangeable Senior Notes due 2029 — — Galaxy Q2-26 10-Q, Note 16 Loans and Notes Payable, acc 0001859392-26-000091 Convertible 402.5 2.50% 2024-11-25 2029 unsecured confirmed
Galaxy Digital Inc. GLXY Deutsche Bank AG Senior secured term loan facility, up to $1.4B (Helios Phase I; Credit Agreement 8/15/25) CoreWeave Dickens County, Texas Q2-26 10-Q Note 16 Notes Payable / Credit Agreement, filed 2026-08-10, acc 0001859392-26-000091 Credit facility 1,400 SOFR +4.75% 2025-08-15 2028-08-15 secured confirmed
Galaxy Digital Inc. GLXY 144A QIBs; The Bank of New York Mellon (trustee) 0.50% Exchangeable Senior Notes due 2031 — — Q2-26 10-Q Note 16 Notes Payable and MD&A liquidity, filed 2026-08-10, acc 0001859392-26-000091 Convertible 1,300 0.50% 2025-10-30 2031-05-01 unsecured confirmed
Galaxy Digital Inc. GLXY Morgan Stanley & Co. LLC (representative of the initial purchasers; purchase agreement 7/23/26) 9.875% Senior Secured Notes due 2031 (Helios Phase II) CoreWeave Dickens County, Texas 8-K 7/28/26 (Items 1.01/2.03 — completion of offering, indenture) Bond 3,507 9.875% 2026-07-28 2031-08-01 secured confirmed
GI Partners (TechCore) Barclays Capital Real Estate Inc. (mortgagee of record) +1 $375M single-asset CMBS, 30 MW Elk Grove Village IL data center — Elk Grove Village, Illinois press Cook County Clerk recorded mortgage, doc 2625710181 (recorded 2026-09-14) Bond 375 6.423% 2026-09-09 2036-09 secured confirmed
Goodman Group GMG Aareal Bank (lender; arranger, facility agent and security agent) €160M acquisition loan, Frankfurt I Data Center (Mörfelden-Walldorf) — — Aareal Bank release 2025-08-07 (lender), linked Credit facility 187 Undisclosed 2025-07 — secured confirmed
Green Mountain (Azrieli Group) Macquarie Capital Principal Finance (lead) EUR 371M senior secured financing, 90 MW Hamar data center (Norway) TikTok press — DLA Piper release 2025-04-02 (law firm Credit facility 400.8 Undisclosed 2025-04-02 — secured press
Green Rocks JV (Green Mountain / KMW) Helaba Landesbank Hessen-Thüringen (lead bank) +1 €600M green loan, Green Rocks data center (Mainz) — — Helaba release 2026-02-02 (lender Credit facility 710.4 Undisclosed 2026-02 — other confirmed
Hut 8 Corp. HUT Anchorage Lending CA, LLC Anchorage equipment loan (ELSAs; restructured 2/2023, equitized 9/2024) — — FY24 10-K (equitization) Credit facility 50 12.00% 2022-03-31 2028-02-02 secured confirmed
Hut 8 Corp. HUT Payee undisclosed TZRC secured promissory note (assumed with King Mountain JV) — — Q2-26 10-Q Note 9 Credit facility 96.8 Lesser of WSJ prime + 12.0% or 1… 2022-12-06 2027-04-08 secured confirmed
Hut 8 Corp. HUT Coinbase Credit, Inc. (lender, collateral agent, administrative agent) Coinbase Bitcoin-collateralized credit facility — — 8-Ks 6/23/25 + 12/31/25 Credit facility 200 9.0% from 6/16/25 (Third A&R) 2023-06-26 2026-06-16 secured confirmed
Hut 8 Corp. HUT Coatue Tactical Solutions Lending Holdings AIV 3 LP Coatue convertible note ($150M, 8.00% PIK-able) — — 8-K 6/24/24 (issuance) Convertible 150 8.00% 2024-06-28 2029-06-28 unsecured confirmed
Hut 8 Corp. HUT Related party (unnamed) SAFE (debt-classified) — — Q2-26 10-Q Note 9 Other 3.5 Undisclosed 2025-02 Converts on equity financing other confirmed
Hut 8 Corp. HUT Two Prime Lending Limited Two Prime revolver (undrawn) — — Q1-26 10-Q Note 9 Credit facility 200 7.99% 2025-08-25 364 days from first borrowing secured confirmed
Hut 8 Corp. HUT 144A via J.P. Morgan (representative) +1 6.192% Senior Secured Notes due 2042 (River Bend LA, 245 MW project bond) Fluidstack Google backstop St. Francisville, Louisiana 8-K 5/1/26 Bond 3,250 6.192% 2026-04-30 2042-11-15 secured confirmed
Hut 8 Corp. HUT FalconX Charlie, Inc. FalconX BTC-collateralized term loan — — Q1-26 10-Q Note 19 + Ex. 10.2 Credit facility 200 7.00% 2026-05-01 2027-04-30 secured confirmed
Hut 8 Corp. HUT 144A via J.P. Morgan (representative) +1 6.129% Senior Secured Notes due 2042 (Nueces County TX, 352 MW project bond) NVIDIA press Nueces County, Texas 8-K 6/10/26 Bond 4,250 6.129% 2026-06-09 2042-11-30 secured confirmed
Hut 8 Corp. HUT JPMorgan Chase Bank, N.A. (admin + collateral agent; lead left arranger) +2 JPMorgan Senior Secured Revolving Credit Facility ($1.07B) — — 8-K 9/28/26 (Credit Agreement filed as EX-10.1 Credit facility 1,070 SOFR +1.75% 2026-09-24 2030-09-24 secured confirmed
Kao Data (Infratil / Legal & General / Goldacre) Deutsche Bank (mandated lead arranger, sole underwriter) £206M term debt facility with Deutsche Bank (accordion to £356M) — — Kao Data release 2024-01-24 Credit facility 262.6 Undisclosed 2024-01-24 — other confirmed
Keel Infrastructure Corp. (formerly Bitfarms Ltd.) KEEL Macquarie Equipment Capital, Inc. (Macquarie Group Commodities and Global Markets) +1 Panther Creek project debt facility (Macquarie; $100M committed of up to $300M; repaid Feb 2026) — — Bitfarms 6-K Ex. 99.1, material change report 2025-10-10 Credit facility 100 8.00% 2025-10-10 2027-04-01 secured confirmed
Keel Infrastructure Corp. (formerly Bitfarms Ltd.) KEEL 144A; initial purchasers not named in the closing release +1 1.375% Convertible Senior Notes due 2031 — — Bitfarms 6-K 2025-10-22, EX-99.1 material change report with the closing release, acc 0001213900-25-101210 Convertible 588 1.375% 2025-10-21 2031-01-15 unsecured confirmed
Keel Infrastructure Corp. (formerly Bitfarms Ltd.) KEEL 144A; initial purchasers not named in the 8-K +1 1.250% Convertible Senior Notes due 2032 — — 8-K 2026-06-10, Items 1.01/2.03/3.02, with EX-4.1 Indenture and EX-99.1 closing release, acc 0001213900-26-067042 Convertible 458 1.25% 2026-06-09 2032-01-15 unsecured confirmed
maincubes (DTCP) Syndicate of eleven banks and one institutional fund (not named) €1.775B committed platform debt facilities (€2.475B with accordion) — — maincubes release 2026-01-13 Credit facility 2,069 Undisclosed 2026-01-13 — other confirmed
Mainova WebHouse (BlackRock / Mainova) ING +7 €475M platform financing for Frankfurt-area data-center construction — — KfW IPEX-Bank release 2024-11-18 Credit facility 500.3 Undisclosed 2024-11 — secured confirmed
Meta / BlackRock "Sopaipilla" JV (El Paso, TX) JPMorgan (syndication, press) +1 7.534% amortizing secured notes due 2048, El Paso JV (Sopaipilla) Meta El Paso, Texas release AB Corporate Shares Form N-PORT (AB Corporate Income Shares), period 2026-07-31, acc 0001410368-26-098190 (holder filing: coupon, maturity, CUSIP) Bond 12,547 7.534% 2026-07-27 2048-11-30 secured confirmed
Meta / Blue Owl "Hyperion" JV (Richland Parish, LA) Morgan Stanley (exclusive FA to Meta + sole bookrunner) +2 Senior secured notes, Hyperion data-center JV Meta Richland Parish, Louisiana press Meta Q3-25 10-Q Note 13 (JV, leases, residual value guarantee) Bond 27,300 6.581% Priced 2025-10-16; JV announced 2025-10-21 2049-05-30 secured confirmed
NEXTDC Limited NXT Commonwealth Bank of Australia (MLAB, press) +3 A$2.9B senior secured bank facilities A-C (common terms platform refinancing) — — NEXTDC FY25 Annual Report and Appendix 4E, Note 15 Borrowings (NEXTDC investor site, lodged with the FY25 results on 2025-08-28). Press for the signing date and lenders: The Motley Fool Australia 2024-11-04 and MT Newswires via Tiger Brokers 2024-11-04. FY26 Annual Report, Notes 18(a) and 21 (2026-08-27). Credit facility 1,915 Undisclosed 2024-11-04 2031-12-03 secured confirmed
NEXTDC Limited NXT ANZ (MLAUB) +5 A$3.5B senior bank facilities D-G (upsized from A$2.2B underwritten) — — NEXTDC 1H26 Interim Report (Reports and Accounts), Note 7 Borrowings, 2026-02-25 Credit facility 2,284 Undisclosed 2025-08-14 2032-12-03 other confirmed
NEXTDC Limited NXT Noteholders (not named) A$750M subordinated floating rate notes due 2030 — — NEXTDC FY26 Annual Report, Note 18(b) Unsecured borrowings and Note 18(d) Fair value Bond 516.5 Priced at a margin of 3.50% over… 2026-04 2030-04-30 unsecured confirmed
NEXTDC Limited NXT Investors in the hybrid securities offer (not named) +1 A$700M unsecured subordinated hybrid securities, Series B delayed draw (undrawn) — — NEXTDC FY26 Annual Report, Note 18(b) Unsecured borrowings and Note 18(d) Fair value Bond 500.4 7.50% 2026-04 Undisclosed unsecured confirmed
NEXTDC Limited NXT Investors in the hybrid securities offer (not named) +1 A$1.0B unsecured subordinated hybrid securities, Series A (7.50% to the first call in May 2031) — — NEXTDC FY26 Annual Report, Note 18(b) Unsecured borrowings and Note 18(d) Fair value Bond 714.9 7.50% 2026-05-15 2126-05-15 unsecured confirmed
NEXTDC Limited NXT ANZ (MLAB, press) +7 A$2.3B senior bank facilities H-K (upsized from A$1.8B) — — NEXTDC FY26 Results Presentation, p.12 senior debt table, 2026-08-27 Credit facility 1,598 Undisclosed 2026-07-10 2033-09 other confirmed
Nexus Data Centers Eagle Point Credit Management (lead, per the Eagle Point release title) +1 Senior secured HoldCo term loan, Nexus Apex Holdings (Eagle Point lead; size not disclosed) — — Eagle Point news page (release title 2026-03-12) Credit facility — Undisclosed 2026-03-12 2029-03-02 secured press
Nexus Data Centers Eagle Point Credit Management (largest investor in the mezzanine loan; other lenders not named, per Private Equity Wire relaying Bloomberg) ~$1.3B private-credit mezzanine loan (Eagle Point Credit Management; Anthropic-leased campus, Google guarantee on the senior debt) Anthropic press Hubbard, Texas press Bloomberg 'Anthropic-Tied Data Center Inks $1.3 Billion Private Credit Loan' (2026-08-19, via Financial Advisor magazine) Credit facility 1,300 Undisclosed 2026-08-19 — other press
Nexus Data Centers Morgan Stanley (leading the bank group) +1 $15.6B construction financing: $14.2B one-year term facility plus $1.4B five-year revolver (Morgan Stanley-led; bond takeout delayed) Anthropic press Google guarantee Hubbard, Texas press Evercore Q3 2026 earnings release (8-K Ex. 99.1, filed 2026-10-28, acc 0001628280-26-067716) Credit facility 15,600 Undisclosed Funded by 2026-10-28 (Bloomberg) — other confirmed
Novva Data Centers / CIM Group J.P. Morgan +1 $2B financing - West Jordan UT AI campus expansion redacted West Jordan, Utah release CIM Group / Novva release 3/5/25 Credit facility 2,000 Undisclosed 2025-03-05 Undisclosed other confirmed
Patmos Hosting Inc. PACE Loan Group (originator) $100M C-PACE financing, Patmos AI Campus (Kansas City, MO) Nebius press — Patmos release 2026-01-12 Credit facility 100 Undisclosed 2026-01-12 — secured confirmed
PolarDC Group Limited (H.I.G. Capital portfolio company) Nordic bond investors +2 €800M senior secured Nordic bond due 2030 (Norway AI data centers; record Nordic high-yield print) Crusoe, CoreWeave release Drangedal, Norway +2 H.I.G. Capital / Polar release 'Polar Completes Record-breaking EUR 800 million Nordic Bond Issue' (PRNewswire 302786449, 2026-06-01) Bond 930 3M Euribor + 600 bp at issue (~8… 2026-05-28 2030-06-04 secured confirmed
Prime Data Centers LLC Banco Santander (sole manager) $900M 7.5% senior secured notes due 2031 (Elk Grove Village, IL; CoreWeave 15-year lease) CoreWeave press Elk Grove Village, Illinois press Bloomberg 'CoreWeave Data Center Raises $900 Million in Junk-Bond Sale' (2026-06-02, via investing.com) Bond 900 7.50% 2026-06-02 2031 secured press
Prime Data Centers LLC Undisclosed $500M Norwegian-law bond (launched at $600M, cut to $500M, sale postponed) — — Bloomberg 'Prime Data Centers Delays Sale of $500 Million Nordic Bond' (2026-07-13). Bloomberg 'AI Borrowers Are Pushing a Niche Credit Market to Its Limits' (2026-07-22, via swissinfo.ch). Bond 500 Undisclosed Launched July 2026; postponed 2026-07-13 — other press
Princeton Digital Group (Warburg Pincus) Maybank (joint green loan coordinator) +2 RM1.276B (~US$280M) green loan, JH1 Johor phase 1 (52 MW) — — PDG release 2024-05-07 Credit facility 280 Undisclosed 2024-05-07 — other confirmed
Princeton Digital Group (Warburg Pincus) SMBC (sole green loan coordinator, agent, security agent and account bank) +1 US$95M green loan, SG1 data center (central Singapore) — — PDG release 2024-06-05 (Princeton Digital Group Secures USD95 Million Green Loan For Its Data Center In Singapore) Credit facility 95 Undisclosed 2024-06-05 — other confirmed
Princeton Digital Group (Warburg Pincus) Not named in the release US$800M project financing, Mumbai, Langfang and Tokyo campuses (May 2025) — — PDG release 2025-05-13 (Princeton Digital Group Raises USD 1.2 Billion in Financing) Credit facility 800 Undisclosed 2025-05-13 — other confirmed
Princeton Digital Group (Warburg Pincus) Barclays (2025 and 2026) +6 US$750M HoldCo sustainability-linked loan (US$400M May 2025, upsized by US$350M March 2026) — — PDG release 2025-05-13 (Princeton Digital Group Raises USD 1.2 Billion in Financing) Credit facility 750 Undisclosed 2025-05-13 — other confirmed
Princeton Digital Group (Warburg Pincus) Axis Bank +2 ~US$160M green loans, MU1 data-center campus (Navi Mumbai) — — PDG release 2025-07-30 Credit facility 160 Undisclosed 2025-07-30 — other confirmed
Princeton Digital Group (Warburg Pincus) DBS (underwriter) +4 US$456M green syndicated facility, JC3 campus (Indonesia, 120 MW) — — PDG release 2026-05-07 (PDG Raising ~USD 856 Million Debt for its Hyperscale Data Center Expansion in Indonesia) Credit facility 456 Undisclosed 2026-05-07 — other confirmed
Princeton Digital Group (Warburg Pincus) Affin Bank (underwriter) +5 ~US$1.3B (~RM5.1B) green financing, JH1 Johor campus (six banks) — — PDG release 2026-11-04 ('PDG Secures ~USD 1.3 Billion for JH1 Campus in Johor') Credit facility 1,300 Undisclosed 2026-11-04 — other confirmed
Princeton Digital Group (Warburg Pincus) PT Bank DBS Indonesia (green loan coordinator) +1 US$105M loan converted to green financing, JC2 data center campus (Jakarta, 22 MW) — — PDG release 2025-03-13 (Princeton Digital Group Converts USD 105 Million Loan into Green Financing for Indonesia Data Center) Credit facility 105 Undisclosed Converted to green financing 2025-03-13; original loan date not disclosed — other confirmed
Project Jupiter (Stargate NM) ~20-bank group; SMBC, BNP Paribas, Goldman Sachs, MUFG admin agents (press) +2 $18B project loan - Jupiter campus (Stargate) Oracle, OpenAI press Doña Ana County, New Mexico Bloomberg-derived press (loan, pricing) Credit facility 18,000 SOFR +2.50% Reported 2025-11-10 2029-11-09 other press
Pure DC (Oaktree-backed; UK data-center developer) SMBC +4 €1.3B committed senior project debt, Seinajoki (Finland) AI campus Phase I (bank financing after an abandoned ~€1B Nordic bond) Microsoft press Seinäjoki, Finland release Pure DC release 'Pure DC Secures Additional EUR 1.3 Billion to Accelerate Growth of One of Europe's Largest AI Campuses' (GlobeNewswire, 2026-07-21) Credit facility 1,484 Undisclosed 2026-07-21 — secured confirmed
Pure DC (Oaktree-backed; UK data-center developer) Citigroup Global Markets (new lender; "leading role" per its quote) +5 $780M Platform Growth Facility, corporate level (~$1.9B with accordion) — — Pure DC release 'Pure DC announces $2 billion financing framework to accelerate growth across Europe and the Middle East' (2026-11-04, also on GlobeNewswire) Credit facility 780 Undisclosed 2026-11-04 — other confirmed
Pure DC (Oaktree-backed; UK data-center developer) SMBC (arranger and original lender; lender counsel Ashurst, 2026-01-14) +2 $2.15B facility secured against the Dublin and Amsterdam campuses (syndicated within three months) Microsoft press Dublin, Ireland release +1 Pure DC release 'Pure DC Secures $2.7 Billion to Accelerate AI Infrastructure Growth Across Europe and the Middle East' (GlobeNewswire, London, 2026-05-28) Credit facility 2,150 Undisclosed Signed by 2026-01-14 (lender counsel Ashurst); announced 2026-05-28 after syndication — secured confirmed
QTS Data Centers (Blackstone) Goldman Sachs (lead; depositor and loan seller affiliates) +1 BX 2024-VLT4 single-borrower CMBS: $1.4B floating-rate loan on five mortgaged properties — — Goldman Sachs Asset Management, 'Commercial Observer - Power Finance 2025' (2025-06-17, lender page: size, date, assets) Bond 1,400 Undisclosed 2024-05 2029-07 secured confirmed
QTS Data Centers (Blackstone) Wells Fargo (depositor and loan seller) +1 BX 2024-VLT5 single-borrower CMBS: $755M loan on three Northern Virginia data centers — — ABS-15G, Wells Fargo Commercial Mortgage Securities, Inc., Ex. 1 KPMG agreed-upon procedures report (2024-10-02) Bond 755 Undisclosed 2024-10 — secured confirmed
QTS Data Centers (Blackstone) Not named in accessible sources $3.522B construction financing, Fayetteville, GA buildings DC9 and DC10 — — Proximo, 2024-10-23 (paywalled, not linked) Credit facility 3,522 Undisclosed 2024-10-23 — other press
QTS Data Centers (Blackstone) Goldman Sachs (lead; loan seller) +9 BX 2025-VLT6 single-borrower CMBS: $2.05B floating-rate loan on four data centers (Sandston, VA and Atlanta) — — ABS-15G/A, GS Mortgage Securities Corporation II, Ex. 1 KPMG agreed-upon procedures report (2025-02-11) Bond 2,050 Undisclosed 2025-02 2027-03-15 secured confirmed
QTS Data Centers (Blackstone) Deutsche Bank Securities (named in the ABS-15G; role not stated) Series 2025-1 data center ABS term notes, Class A-2 + Class B (Hillsboro, OR; first QTS Issuer ABS I issuance) — — ABS-15G, QTS Hillsboro Holding I, LLC for QTS Issuer ABS I, LLC, Ex. 99.1 Deloitte agreed-upon procedures report (acc 0001140361-25-019986, 2025-05-21) Bond — 5.439% 2025-06 2030-05 secured confirmed
QTS Data Centers (Blackstone) Morgan Stanley +7 BX 2025-VLT7 single-borrower CMBS: $1.5B floating-rate loan on two data centers (Atlanta, Sandston VA; 138 MW) — — ABS-15G, Morgan Stanley Capital I Inc., Ex. 1 Ernst & Young agreed-upon procedures report (2025-06-24) Bond 1,500 Undisclosed 2025-07 2027-07-15 secured confirmed
QTS Data Centers (Blackstone) Private placement investors (not named) About $1.65B privately placed high-grade bonds, 5-, 7- and 10-year (August 2025) — — Bloomberg 2025-08-13 via Bloomberg Law ('Blackstone's QTS Raises $1.65 Billion of Debt for Data Centers' Bond 1,650 Undisclosed 2025-08-13 ~2030 to ~2035 other press
QTS Data Centers (Blackstone) Deutsche Bank Securities (arranger; named in the ABS-15G) +2 Series 2025-1 data center ABS term notes, Class A-2 + Class B: $599.8M (PHX2DC2, Phoenix) — — ABS-15G, QTS Phoenix II DC2 Holding I, LLC for QTS Issuer ABS II, LLC, Ex. 99.1 Deloitte agreed-upon procedures report (2025-08-28) Bond 599.8 5.044% 2025-09 2030-10 secured confirmed
QTS Data Centers (Blackstone) Citi Real Estate Funding (lead originator) +10 BX 2025-VOLT single-borrower CMBS: $3.46B floating-rate loan on 10 data centers (214.9 MW) — — ABS-15G, Citigroup Commercial Mortgage Securities Inc., Ex. 99.1 agreed-upon procedures report (2025-11-06) Bond 3,460 SOFR +1.70% 2025-11 2027-12-15 secured confirmed
QTS Data Centers (Blackstone) Goldman Sachs, MUFG, SMBC and BNP Paribas (leads; SMBC sole structuring agent, press) About $1.7B private placement notes, five tranches of 5 to 15 years (priced November 2025) — — New Project Media 2026-01-06 ('QTS nets USD 1.7bn private placement with four banks, up to 15-year maturities') Bond 1,700 Undisclosed 2025-11 ~2030 to ~2040 other press
QTS Data Centers (Blackstone) Barclays (named in the ABS-15G; role not stated) Series 2026-1 and 2026-2 data center ABS term notes (January 2026) — — ABS-15G, QTS Phoenix II DC2 Holding I, LLC for QTS Issuer ABS II, LLC, Ex. 99.1 Deloitte agreed-upon procedures report (acc 0001140361-26-000524, 2026-01-07 Bond — 5.848% 2026-01 — secured confirmed
QTS Data Centers (Blackstone) Bank of America +10 BX 2026-VLT9 single-borrower CMBS: $2.05B floating-rate loan on three data centers (Manassas, Suwanee, Chicago) — — ABS-15G, QTS Depositor 2026, LLC, Ex. 99.1 Ernst & Young agreed-upon procedures report (2026-02-04) Bond 2,050 SOFR +1.70% 2026-02 — secured confirmed
QTS Data Centers (Blackstone) TD Securities (arranger; named in the ABS-15G) +2 Series 2026-4 and 2026-5 data center ABS term notes: $510M (PHX2DC2, PHX2DC3, RIC2DC3) — — ABS-15G, QTS Phoenix II DC2 Holding I, LLC for QTS Issuer ABS II, LLC, Ex. 99.1 Deloitte agreed-upon procedures report (2026-03-06) Bond 510 5.704% 2026-03 — secured confirmed
QTS Data Centers (Blackstone) Bookrunners not named in accessible sources $4.6B 5.7% senior secured green notes due 2036 (Fayetteville, GA; Microsoft 20-year lease) Microsoft press Fayetteville, Georgia press Bloomberg 'Blackstone-Backed Data Center Firm QTS Kicks Off Bond Sale' (2026-04-06) Bond 4,600 5.70% 2026-04-06 2036-04-15 secured press
QTS Data Centers (Blackstone) Wells Fargo (structuring agent, co-originator) +9 $1.26B single-asset CMBS, NAL1DC1 New Albany, OH (66 MW; BX 2026-VLT10) — — ABS-15G 2026-05-27 (QTS VLT10 Depositor, LLC Bond 1,260 5.85% 2026-06 ~2036 secured confirmed
QTS Data Centers (Blackstone) TD Securities (sole structuring advisor) +3 Series 2026-6 and 2026-7 data center ABS notes plus floating-rate loan: up to $870M (five data centers, 181.5 MW) — — ABS-15G, QTS Phoenix II DC2 Holding I, LLC for QTS Issuer ABS II, LLC, Ex. 99.1 Deloitte agreed-upon procedures report (2026-06-15) Bond 870 5.682% 2026-06 — secured confirmed
QTS Data Centers (Blackstone) JPMorgan (administrative agent, lead bookrunner) +2 $3.25B senior secured term loans (12-data-center master indenture pool) — — PitchBook (pricing, size, tenor, agent, use of proceeds) via Yahoo Finance 2026-07-17, 'Blackstone's QTS secures upsized $3.25B leveraged loan' Credit facility 3,250 SOFR +2.25% 2026-07-30 2033-07-22 secured press
QTS Data Centers (Blackstone) Citigroup +3 $3.9B senior notes, 5-year (Georgia venture; Microsoft tenant) Microsoft press — Bloomberg 'Blackstone-Backed QTS Kicks Off Data Center Bond at Hefty Cost' (2026-08-18) Bond 3,900 7.228% 2026-08-18 2031-09-01 other press
QTS Data Centers (Blackstone) Mizuho, Natixis, Societe Generale and Wells Fargo (arrangers, press) About $800M Thunder private placement notes, 7 to 15 years (marketing, October 2026) — — Bloomberg via PE Insights 2026-10-28 ('Blackstone's QTS brings the Thunder') Bond 800 Undisclosed Reported 2026-10-28; not priced Undisclosed other rumored
Riot Platforms, Inc. RIOT 144A; Citigroup, BTIG and Cantor Fitzgerald (representatives); U.S. Bank Trust Co. (trustee) 0.75% Convertible Senior Notes due 2030 — — 8-K 12/11/24 Items 1.01/2.03/3.02 and EX-4.1 Indenture, acc 0001104659-24-127656 Convertible 594.4 0.75% 2024-12-11 2030-01-15 unsecured confirmed
Riot Platforms, Inc. RIOT Coinbase Credit, Inc. (lender, collateral agent and administrative agent) $200M Coinbase Credit bitcoin-backed multi-draw term loan (repaid Sep 2026) — — Q3-26 10-Q Note 11 ($200 Million Credit Facility), acc 0001104659-26-122417 Credit facility 200 Until 2026-04-21: the greater of… 2025-04-22 2027-04-20 secured confirmed
Riot Platforms, Inc. RIOT Morgan Stanley Senior Funding, Inc. (administrative agent and sole lender at signing: $573.0M commitment, Credit Agreement Schedule 1.1) $573.0M senior secured delayed-draw term loan: Rockdale interim facility Anthropic press Rockdale, Texas 8-K, Items 1.01 and 2.03 (event 2026-08-10, filed 2026-08-14), acc. 0001104659-26-097330 Credit facility 573 SOFR +2.75% 2026-08-10 2026-12-31 secured confirmed
Riot Platforms, Inc. RIOT Banks (not named) ~$180M term loan on the AMD Rockdale lease, plus delayed draw (expected; not closed) — — Riot 8-K 2026-11-04, EX-99.2 Q3 2026 earnings deck (slides 5, 17, 18), acc. 0001104659-26-122368 Credit facility 180 Undisclosed Expected to close shortly (Q3 2026 deck, 2026-11-04); not closed Undisclosed other confirmed
Riot Platforms, Inc. RIOT — Planned non-recourse project debt, Corsicana lease to Anthropic (illustrative $4.4B to $4.9B) — — Riot 8-K 2026-11-04, EX-99.2 Q3 2026 earnings deck (slides 7, 9, 10, 17, 18) and EX-99.1 release, acc. 0001104659-26-122368 Credit facility 4,650 Undisclosed Planned (Q3 2026 deck, 2026-11-04); financing process to launch in 2027 Undisclosed other confirmed
Rowan Digital Infrastructure (Quinbrook) MUFG (co-structuring agent; led the financing) +3 Bauxite campus Phase 1 construction financing (Maryland) — — Rowan Digital Infrastructure release 2025-01-16 Credit facility 975 Undisclosed 2025-01-16 — other confirmed
Rowan Digital Infrastructure (Quinbrook) SMBC (co-structuring agent) +3 Bauxite campus Phase 2 construction financing (Maryland) — — Rowan Digital Infrastructure release 2025-02-25 Credit facility 1,240 Undisclosed 2025-02-25 — other confirmed
Rowan Digital Infrastructure (Quinbrook) SMBC, MUFG, Mizuho, Societe Generale (lead arrangers) Bauxite campus Phase 3 green financing (Maryland) — — Rowan Digital Infrastructure release 2025-09-11 Credit facility 925 Undisclosed 2025-09-11 — other confirmed
Rowan Digital Infrastructure (Quinbrook) Apterra (provider, sole bookrunner and joint lead arranger) +1 $300M corporate credit facility: term loan + letter of credit facility (Apterra) — — Rowan Digital Infrastructure release 2025-09-11 Credit facility 300 Undisclosed 2025-09-11 — other confirmed
Rowan Digital Infrastructure (Quinbrook) TD and Mizuho (co-structuring agents, coordinating lead arrangers and joint bookrunners per Rowan's release; co-structuring agents per counsel's deal note) +3 Cinco campus Phase 1 construction financing, about $550M (300 MW campus, Medina County, TX) — — Rowan Digital Infrastructure release 2026-02-11 ('Rowan Secures $550 Million of Construction Financing for 300 MW Cinco Project in Texas') Credit facility 551 Undisclosed 2026-02-11 — secured confirmed
Rowan Digital Infrastructure (Quinbrook) Lenders not named in the release ('institutional lenders') Project Temple green debt financing, nearly $3B (300 MW campus, Temple, TX) — — Rowan Digital Infrastructure release 2026-05-27 Credit facility 3,000 Undisclosed 2026-05-27 — other confirmed
Sabey Data Centers Guggenheim Securities, LLC (arranger per ASR; specified party in the ABS-15G due-diligence report) Series 2025-1 Class A-2 term ABS notes, $410M (Sabey master trust) — — ABS-15G 2025-01-24 (Sabey Data Center Asset Holdings LLC, acc 0001193125-25-012131, Ex. 99.1) Bond 410 5.733% 2025-02-20 2030-02 secured confirmed
Sabey Data Centers TD Securities (USA) LLC (arranger per ASR; specified party in the ABS-15G due-diligence report) Series 2025-2 Class A-2 term ABS notes, $435M (Sabey master trust) — — ABS-15G 2025-03-25 (Sabey Data Center Asset Holdings LLC, acc 0001193125-25-062672, Ex. 99.1) Bond 435 5.966% 2025-04-10 2032-04 secured confirmed
Sabey Data Centers Not named in sources read Series 2026-1 Class A-2 term ABS notes (Sabey master trust; size not disclosed) — — ABS-15G 2026-01-16 (Sabey Data Center Asset Holdings LLC, acc 0001193125-26-015461) Bond — 5.482% 2026-01 2051-01-20 secured confirmed
SB Energy, Inc. SBE Deutsche Bank Trust Company Americas (administrative and collateral agent) +3 Hickory Facilities: $263.0M term loan and $262.0M revolver (SOFR + 3.75%), plus a $475.0M letter of credit facility — — SB Energy S-1/A No. 2 filed 2026-09-21, acc 0001628280-26-062846 (Description of Certain Indebtedness, Hickory Credit Agreement Credit facility 525 SOFR +3.75% 2023-10-18 2027-10-18 secured confirmed
SB Energy, Inc. SBE 144A / Reg S noteholders +1 8.875% Senior Secured Notes due 2031 (Cosmos Technology Campus, Travis County TX, ~50 MW) SoftBank affiliate Austin, Texas SB Energy S-1/A No. 2 filed 2026-09-21, acc 0001628280-26-062846 (Description of Certain Indebtedness Bond 999 8.875% 2026-05-07 2031-05-01 secured confirmed
SB Energy, Inc. SBE — Planned lessor project debt for the PORTS-Pike campuses leased to OpenAI (about $122B to $138B) — — SB Energy S-1/A No. 2 filed 2026-09-21, acc 0001628280-26-062846 Credit facility 130,000 Undisclosed Planned (S-1/A No. 2, 2026-09-21) Undisclosed other confirmed
SB Energy, Inc. SBE Citibank, N.A. (expected administrative and collateral agent) Planned $3.0B Credit Facility: $1.875B revolver and $1.125B letter of credit facility (Citibank agent) — — SB Energy S-1/A No. 2 filed 2026-09-21, acc 0001628280-26-062846 (Description of Certain Indebtedness, New Credit Facility Credit facility 1,875 SOFR +1.75–2.25% Planned (S-1/A No. 2, 2026-09-21) Three and one-half years after closing secured confirmed
Scala Data Centers (DigitalBridge) Banco Bradesco BBI (lead coordinator) +6 R$2B green debentures due ~2027 (Brazil; first green issue) — — Scala release 2022-12-19 (Scala Data Centers issues R$2 billion in green debentures) Bond 376.3 Undisclosed 2022-12-19 ~2027 other confirmed
Scala Data Centers (DigitalBridge) Banco Bradesco BBI (lead coordinator) +2 US$215M green debentures due ~2029 (Brazil; second green issue, BRL swapped to USD) — — Scala release 2023-11-21 (English and Portuguese versions) Bond 215 Undisclosed 2023-11-21 ~2029 other confirmed
Scala Data Centers (DigitalBridge) Banco Bradesco BBI (lead coordinator) +4 R$1.37B (US$250M) green debentures due ~2030, SGRUTB09 at the Tamboré campus (Brazil; third green issue) — — Scala release 2024-08-20 (Portuguese: Scala Data Centers emite R$ 1,37 bilhão em debêntures verdes com swap em dólar) Bond 250 Undisclosed 2024-08-20 ~2030 other confirmed
Scala Data Centers (DigitalBridge) MUFG (lead, press) +3 US$328M green project finance, three hyperscale data centers and Nova Lampa substation (Chile) — — Converge Digest 2025-07-29 (lenders Credit facility 328 Undisclosed 2025-07 — other press
Serverfarm (Manulife IM) Morgan Stanley (sole structuring agent, lead left bookrunner) +2 Series 2025-1 term ABS notes, $589M inaugural securitization ($543M 5.377% + $46M 5.866%) — — Serverfarm release 2026-02-04 (TR Newswire) Bond 589 5.377% 2025-12 2030-11 secured confirmed
Sify Technologies Limited SIFY Debenture holders (not named) ₹2,500M 8.95% secured listed non-convertible debentures due ~2040 (refinanced data-center debt) — — Sify Technologies Form 20-F for FY ended 2026-03-31 (filed 2026-06-26), Note 20 Borrowings Bond 29.8 8.95% 2024-10 ~2040 secured confirmed
Sify Technologies Limited SIFY International Finance Corporation (IFC; direct lender) IFC sustainability-linked loan, $71M (INR 675 crore): two AI-ready data centers in Navi Mumbai and Chennai — — IFC release 2026-06-18 Credit facility 71 Undisclosed 2026-06-18 — other confirmed
Sify Technologies Limited SIFY Indian banks and NBFCs (not named in the 20-F) Secured term loans for specific data-center projects: banks ₹13,860M and NBFCs ₹5,752M at 2026-03-31 (pool) — — Sify Technologies Form 20-F for FY ended 2026-03-31, Note 20 Borrowings Credit facility 209 Undisclosed Various (pool) — secured confirmed
Singapore Telecommunications Limited (Singtel) Z74 DBS Bank Ltd. (lender, green loan coordinator) +3 S$535M five-year green loan (refinancing): DC West and DC Kim Chuan, Singapore — — Singtel release 2023-12-04 (Nxera newsroom) Credit facility 400.6 Undisclosed 2023-12-04 — other confirmed
Singapore Telecommunications Limited (Singtel) Z74 DBS Bank Ltd. (arranger, green loan coordinator) +4 S$643M five-year green term, revolving and bank guarantee facilities: DC Tuas, Singapore (58 MW) — — Singtel/Nxera release 2025-02-07 Credit facility 475.9 Undisclosed 2025-02-07 — other confirmed
Soluna Holdings, Inc. SLNH Certain accredited investors (undisclosed) October 2021 secured convertible notes — — FY25 10-K (convertible notes) Convertible 16.3 Undisclosed 2021-10-25 — secured confirmed
Soluna Holdings, Inc. SLNH NYDIG ABL LLC (lender, servicer, collateral agent) NYDIG Master Equipment Finance Agreement — — FY25 10-K (settlement + debt table) Credit facility 14.4 14.00% 2021-12-30 — secured confirmed
Soluna Holdings, Inc. SLNH Navitas West Texas Investments SPV, LLC Navitas 2-year term loan (Project Dorothy 1B) — Silverton, Texas Q1-25 10-Q (Navitas term loan) Credit facility 2.05 15.00% 2023-05-09 2025-05-09 secured confirmed
Soluna Holdings, Inc. SLNH Soluna2 SLC Fund II Project Holdco Equipment Loan Agreement (Spring Lane) — Silverton, Texas +1 Q2-26 10-Q Note 10 Credit facility 4 15.00% 2024-05-16 2027-05-16 other confirmed
Soluna Holdings, Inc. SLNH GreenCloud Partners, LLC (f/k/a Green Cloud Holdings, LLC) "Green Cloud" secured note (HPE AI-cloud deal) — — Q2-26 10-Q Note 10 Credit facility 12.5 9.00% 2024-06-20 2027-06-20 secured confirmed
Soluna Holdings, Inc. SLNH Additional accredited investors (undisclosed) CloudCo Additional Secured Notes ($1.25M, June SPA First Amendment) — — FY25 10-K (June SPA First Amendment / Additional Notes) Credit facility 1.25 9.00% 2024-07-12 2027-07-12 secured confirmed
Soluna Holdings, Inc. SLNH Galaxy Digital LLC Galaxy Loan (Project Sophie) — Murray, Kentucky Q2-26 10-Q Note 10 Credit facility 5 15.00% 2025-03-12 2030-03-12 secured confirmed
Soluna Holdings, Inc. SLNH Generate Strategic Credit Master Fund I-A, L.P. (lender) +1 Generate Credit Agreement — Tranches A-1/A-3 — Silverton, Texas +2 Q2-26 10-Q Note 10 (prepayment) Credit facility 17 SOFR +10.00% 2025-09-12 2030-09-12 secured confirmed
Soluna Holdings, Inc. SLNH Soluna2 Kati Project Holdco (Spring Lane) Land Purchase Loan (Kati Phase 2) — Willacy County, Texas Q2-26 10-Q Note 10 Credit facility 1.08 0.00% 2025-10-01 2027-05-16 other confirmed
Soluna Holdings, Inc. SLNH Generate Strategic Credit Master Fund I-A, L.P. (lender) +1 Generate Tranche C (Briscoe wind farm) — — Q2-26 10-Q Note 10 Credit facility 12.5 SOFR +8.00% 2026-04-01 2030-09-12 secured confirmed
Soluna Holdings, Inc. SLNH YA II PN, LTD. (Yorkville) Yorkville promissory note — — 8-K 4/17/26 Credit facility 12 5.00% 2026-04-15 2027-05-15 unsecured confirmed
Soluna Holdings, Inc. SLNH Soluna SLC Fund I Projects Holdco LLC (Spring Lane Capital affiliate, seller) Dorothy 1A Class B buyout deferred purchase payable ($10.5M, Spring Lane) — — Q2-26 10-Q (Dorothy 1A purchase) Other 10.5 Undisclosed 2026-04-15 2026-07-01 unsecured confirmed
STACK Infrastructure (Blue Owl) Conduit investors and committed note purchasers under the Series 2019-1 Variable Funding Note Purchase Agreement (not named in the filings read) +1 Series 2019-1 Class A-1 Secured Variable Funding Notes, $200M (STACK master trust) — — Blue Owl Digital Infrastructure Trust Q3 2026 10-Q (acc 0002069692-26-000069) Note 8 Credit facility 200 SOFR +1.75% 2019-02-08 2028-05-27 secured confirmed
STACK Infrastructure (Blue Owl) Guggenheim Securities (initial purchaser) +3 1.877% Secured Data Center Revenue Term Notes, Series 2021-1 Class A-2 (STACK master trust; repaid) — — Series 2021-1 Supplement dated 2021-03-18, Ex. 4.11 to Blue Owl Digital Infrastructure Trust 10-K for FY2025 (acc 0002069692-26-000016) Bond 400 1.877% 2021-03-18 2026-03 secured confirmed
STACK Infrastructure (Blue Owl) Morgan Stanley & Co. (initial purchaser) +7 5.900% Secured Data Center Revenue Term Notes, Series 2023-1 Class A-2 (STACK master trust; repaid) — — Series 2023-1 Supplement dated 2023-03-15, Ex. 4.10 to Blue Owl Digital Infrastructure Trust 10-K for FY2025 (acc 0002069692-26-000016) Bond 250 5.90% 2023-03-15 2028-03 secured confirmed
STACK Infrastructure (Blue Owl) Wilmington Trust, N.A. (indenture trustee) 5.900% Secured Data Center Revenue Term Notes, Series 2023-2 Class A-2 (STACK master trust) — — Series 2023-2 Supplement dated 2023-07-31, Ex. 4.9 to Blue Owl Digital Infrastructure Trust 10-K for FY2025 (acc 0002069692-26-000016) Bond 250 5.90% 2023-07-31 2028-07 secured confirmed
STACK Infrastructure (Blue Owl) Wilmington Trust, N.A. (indenture trustee) 5.900% Secured Data Center Revenue Term Notes, Series 2023-3 Class A-2 (STACK master trust) — — Series 2023-3 Supplement dated 2023-11-14, Ex. 4.8 to Blue Owl Digital Infrastructure Trust 10-K for FY2025 (acc 0002069692-26-000016) Bond 290 5.90% 2023-11-14 2028-10 secured confirmed
STACK Infrastructure (Blue Owl) TD Securities (USA) (initial purchaser) +8 5.900% Secured Data Center Revenue Term Notes, Series 2024-1 Class A-2 (STACK master trust) — — Series 2024-1 Supplement dated 2024-03-20, Ex. 4.7 to Blue Owl Digital Infrastructure Trust 10-K for FY2025 (acc 0002069692-26-000016) Bond 240 5.90% 2024-03-20 2029-03 secured confirmed
STACK Infrastructure (Blue Owl) Not named in release $3.3B cumulative green financing: Silicon Valley, Loudoun County VA and Milan — — STACK Infrastructure release 2024-04-09 Credit facility 3,300 Undisclosed 2024-04-09 — other confirmed
STACK Infrastructure (Blue Owl) Not named in release $1.3B cumulative financing: Melbourne, Manassas, Loudoun, Prince William County and Milan — — STACK Infrastructure release 2024-06-04 Credit facility 1,300 Undisclosed 2024-06-04 — other confirmed
STACK Infrastructure (Blue Owl) Not named in release $3B green financing for four U.S. data center projects (Prince William County VA, Phoenix, Atlanta) — — STACK Infrastructure release 2024-08-05 Credit facility 3,000 Undisclosed 2024-08-05 — other confirmed
STACK Infrastructure (Blue Owl) Not named in release $900M green financing: NVA05 campus, Manassas VA (200 MW) — — STACK Infrastructure release 2025-01-14 Credit facility 900 Undisclosed 2025-01-14 — other confirmed
STACK Infrastructure (Blue Owl) Not named in release $4B green financing: Stafford VA (1+ GW), Portland OR and Toronto campuses — — STACK Infrastructure release 2025-03-19 Credit facility 4,000 Undisclosed 2025-03-19 — other confirmed
STACK Infrastructure (Blue Owl) Banks and institutional capital providers (not named in release) $1.4B green financing facility secured by 10 stabilized North American data centers — — STACK Infrastructure release 2025-05-13 (PDF PRE9681) Credit facility 1,400 Undisclosed 2025-05-13 — secured confirmed
STACK Infrastructure (Blue Owl) SMBC Nikko Securities America (initial purchaser) +11 5.00% Secured Data Center Revenue Term Notes, Series 2025-1 Class A-2 (STACK master trust) — — Series 2025-1 Supplement dated 2025-05-22, Ex. 4.6 to Blue Owl Digital Infrastructure Trust 10-K for FY2025 (acc 0002069692-26-000016) Bond 345 5.00% 2025-05-22 2030-05 secured confirmed
STACK Infrastructure (Blue Owl) Deutsche Bank (MLAUB) +4 A$1.3B green financing facility: MEL01 hyperscale campus, West Melbourne — — STACK Infrastructure release 2025-07-23 Credit facility 857.5 Undisclosed 2025-07-23 — other confirmed
STACK Infrastructure (Blue Owl) Natixis CIB (full underwriter, green loan coordinator) +2 ¥39.7B green financing facility: TKY01 campus, Inzai, Greater Tokyo (36 MW) — — STACK Infrastructure release 2025-10-23 Credit facility 260.1 Undisclosed 2025-10-23 — other confirmed
STACK Infrastructure (Blue Owl) Wilmington Trust, N.A. (indenture trustee) +1 5% Secured Data Center Revenue Term Notes, Series 2026-1 Class A-2 — — Blue Owl Digital Infrastructure Trust 8-K (Item 1.01), report date 2026-03-03, filed 2026-03-05 Bond 695 5.00% 2026-03-03 2056-03-27 secured confirmed
STTGDC (KKR / Singtel) United Overseas Bank (Malaysia) Bhd (sole coordinator, mandated lead arranger) +3 Up to US$1.37B (MYR 5.6B) green financing, STT Johor campus (incl. Phase 1 green loan facility) — — STT GDC release 2026-08-13 Credit facility 1,370 Undisclosed 2026-08-13 — other confirmed
STTGDC (KKR / Singtel) Standard Chartered (lead coordinator, green loan coordinator) +4 JPY 93B green loan, Tokyo campus fit-out and operation (TYO1 and TYO2) — — STTGDC release 2026-10-27 Credit facility 589.3 Undisclosed 2026-10-27 — other confirmed
Switch (DigitalBridge) Morgan Stanley (sole structuring advisor) Secured Data Center Revenue Term Notes, Series 2024-1 (Class A + Class B), inaugural master-trust ABS — — Switch release 2024-06-24 ('Switch Completes $1.7 Billion in ABS Financing') Bond 751.8 6.28% 2024-03-14 2054-03-25 secured confirmed
Switch (DigitalBridge) Morgan Stanley (co-structuring advisor) +4 Secured Data Center Revenue Term Notes, Series 2024-2 (Classes A, B, C) — — Switch release 2024-06-24 ('Switch Completes $1.7 Billion in ABS Financing') Bond 940.3 5.436% 2024-06-17 2054-06-25 secured confirmed
Switch (DigitalBridge) J.P. Morgan (co-structuring agent and joint lead arranger) +3 $4.25B sustainability-linked borrowing base facility ($3.5B revolver + $750M term loan) — — Switch release 'Switch Secures $5 Billion in New Debt Financing' 2024-09-12 Credit facility 4,250 Undisclosed 2024-09-12 — other confirmed
Switch (DigitalBridge) TD Securities (left lead arranger and administrative agent) $770M revolving credit facility (upsized; working capital and general corporate purposes) — — Switch release 'Switch Secures $5 Billion in New Debt Financing' 2024-09-12 Credit facility 770 Undisclosed 2024-09-12 — other confirmed
Switch (DigitalBridge) Citigroup Global Markets (co-lead manager, joint bookrunner) +4 $2.4B SASB CMBS, SWCH 2025-DATA (Las Vegas 7, Las Vegas 9, Reno 2), green — — Switch release 2025-03-25 Bond 2,400 SOFR +1.50% 2025-02-05 2027-02 secured confirmed
Switch (DigitalBridge) Morgan Stanley (co-structuring advisor) +3 Secured Data Center Revenue Term Notes, Series 2025-1 (Class A-2 + Class B), third master-trust ABS, green — — Switch release 2025-03-25 ('Switch Announces $3.5 Billion in Securitized Debt Financings') Bond 1,093 5.036% 2025-03-13 2055-03-25 secured confirmed
Switch (DigitalBridge) Wells Fargo Securities (co-structuring advisor, lead left bookrunner) +4 Secured Data Center Revenue Term Notes, Series 2025-2 (Class A-2 + Class B), fourth master-trust ABS — — Switch release 2025-10-20 Bond 659 5.121% 2025-10-20 2030-10 secured confirmed
Switch (DigitalBridge) Barclays (co-structuring advisor, joint active bookrunner) +3 Secured Data Center Revenue Term Notes, Series 2026-1 Class A-2, fifth master-trust ABS — — Switch release 2026-04-14 Bond 768 5.609% 2026-03 2031-03 secured confirmed
TeraWulf Inc. WULF Morgan Stanley (expected lead, per press) Planned Justified campus project financing (~$3.5B leveraged loan and high-yield mix per press) — — TeraWulf 8-K 2026-11-04 (Item 1.01 credit support agreements, EX-10.1 form, EX-99.1 release on the Google backstop and Fluor EPC), acc 0001628280-26-069810 Other 3,500 Undisclosed — Undisclosed other rumored
TeraWulf Inc. WULF Cantor Fitzgerald (representative, 144A) 2.75% Convertible Senior Notes due 2030 — — Q2-26 10-Q (6/30/26 balance), acc 0001083301-26-000166 Convertible 500 2.75% 2024-10-25 2030-02-01 unsecured confirmed
TeraWulf Inc. WULF Morgan Stanley (representative) +1 1.00% Convertible Senior Notes due 2031 — — 8-K 8/20/25 ($850M) Convertible 1,000 1.00% 2025-08-20 2031-09-01 unsecured confirmed
TeraWulf Inc. WULF Morgan Stanley (sole initial purchaser, 144A) +1 7.750% Senior Secured Notes due 2030 Fluidstack Google backstop Barker, New York 8-K 10/23/25 (indenture Ex. 4.1) Bond 3,200 7.75% 2025-10-23 2030-10-15 secured confirmed
TeraWulf Inc. WULF Morgan Stanley + Cantor (representatives) +1 0.00% Convertible Senior Notes due 2032 — — 8-K 10/31/25 Convertible 1,025 0.00% 2025-10-31 2032-05-01 unsecured confirmed
TeraWulf Inc. WULF Morgan Stanley Senior Funding, Inc. (admin + collateral agent) +1 Raylan Data Delayed-Draw Bridge Facility ($500M 364-day, Morgan Stanley) — Hawesville, Kentucky 8-K 3/16/26 (origination) Credit facility 500 SOFR +2.75% 2026-03-13 2027-03-12 secured confirmed
TeraWulf Inc. WULF MS Senior Funding (admin/collateral) +1 Senior Secured Revolving Credit Facility — — Q3-26 10-Q Note 10 and Amendment No. 1 (EX-10.1), acc 0001628280-26-071671 Credit facility 400 SOFR +1.75% 2026-05-07 2030-05-07 secured confirmed
TierPoint Guggenheim Securities (sole structuring advisor, joint active bookrunner) +4 Secured Data Center Revenue Term Notes, 2023 issuance, 3-year tranche, $360M (refinanced) — — TierPoint release 2023-07-10 Bond 360 Undisclosed 2023-07-10 ~2026-07 secured confirmed
TierPoint Guggenheim Securities (sole structuring advisor, joint active bookrunner) +4 Secured Data Center Revenue Term Notes, 2023 issuance, 7-year tranche, $475M — — TierPoint release 2023-07-10 Bond 475 Undisclosed 2023-07-10 ~2030-07 secured confirmed
TierPoint Not named in releases Variable funding notes, $225M (TierPoint ABS master trust) — — TierPoint releases 2023-07-10, 2025-04-09 and 2025-07-14 Credit facility 225 Undisclosed 2023-07-10 2030 secured confirmed
TierPoint Guggenheim Securities (sole structuring advisor, lead placement agent) +2 Secured Data Center Revenue Term Notes, Series 2024-1 (Class A + Class B), $550M — — TierPoint release 2024-05-08 Bond 550 Undisclosed 2024-05-08 — secured confirmed
TierPoint Guggenheim Securities (sole structuring advisor, lead bookrunner) +2 Secured Data Center Revenue Term Notes, Series 2025-1 and 2025-2, $500M — — TierPoint release 2025-04-09 Bond 500 6.15% 2025-04-09 2055-04-26 secured confirmed
TierPoint Apterra Infrastructure Capital (lead arranger, sole bookrunner, administrative agent) +1 $250M parent term loan, part delayed draw (Apterra) — — TierPoint release 2025-07-14 Credit facility 250 Undisclosed 2025-07-14 — other confirmed
TierPoint Guggenheim Securities (lead structuring advisor, lead left bookrunner, placement agent) +1 Secured Data Center Revenue Term Notes, Series 2025-3, $240M — — TierPoint release 2025-10-23 Bond 240 Undisclosed 2025-10-23 — secured confirmed
Urbacon (UDCS) TD Securities (USA) LLC (structured and led; placement agent) Secured Data Center Revenue Term Notes, Series 2025-1 Class A-2 (C$320M) — — UDCS release 2025-08-28 (CNW) Bond 232.7 4.511% 2025-08 2055-08-25 secured confirmed
Vantage Data Centers CTBC Bank +1 TPE11 project financing loan (Taipei) — — Vantage release 2024-03-04 Credit facility 64 Undisclosed 2024-03-04 — other confirmed
Vantage Data Centers Wells Fargo Securities, LLC (structuring bank; led the bank syndicate) +3 $3B green revolving credit facility (North America; initial pool of eight sites) — — Vantage release 2024-04-23 Credit facility 3,000 Undisclosed 2024-04-23 — secured confirmed
Vantage Data Centers Barclays (sole structuring advisor and sole green structuring advisor; joint lead manager) +1 £600M green securitized term notes, Series 2024-1A Class A2 (Cardiff campus; first EMEA data center ABS) — — Vantage release 2024-06-04 Bond 767.1 6.172% 2024-06-04 2039-05-28 secured confirmed
Vantage Data Centers Wells Fargo Securities (named in the ABS-15G; role not stated) Retained Vantage master trust term notes, Series 2024-1 (Class A-2 + Class B) — — ABS-15G 2024-08-07 (Retained Vantage Data Centers, LP Bond — 4.992% 2024-08 2049-09-15 secured confirmed
Vantage Data Centers Deutsche Bank Securities (named in the ABS-15G; role not stated) Secured Data Center Revenue Term Notes, Series 2024-1 (North American master trust) — — ABS-15G 2024-09-18 (Vantage Data Centers Holdings, LLC Bond — 5.10% 2024-09 2054-09-15 secured confirmed
Vantage Data Centers Wells Fargo (originator; depositor affiliate) +4 $735M single-borrower CMBS, VDCM 2025-AZ (three Goodyear, AZ data centers, 64 MW) — — CPE 'Vantage Secures $735M Refi for Phoenix Data Centers' (2025-06-25) Bond 735 Undisclosed 2025-06 — secured confirmed
Vantage Data Centers MUFG and Societe Generale (leads) New Albany, OH campus construction loan ($2.25B) — — Vantage Data Centers release 2025-06-03 Credit facility 2,250 Undisclosed 2025-06-03 — other confirmed
Vantage Data Centers Wells Fargo Securities (structuring bank) +1 $2.75B upsize of North America green revolving credit facility (to $5.75B) — — Vantage Data Centers release 2025-06-03 Credit facility 2,750 Undisclosed 2025-06-03 — secured confirmed
Vantage Data Centers Barclays (sole structuring advisor; active joint lead manager) +3 Germany lease-receivable ABS, Class A-2 + Class B (€640M) — — Vantage Data Centers release 2025-06-09 Bond 731.2 4.292% 2025-06-09 2050-06-28 secured confirmed
Vantage Data Centers Guggenheim Securities and Scotia Capital (named in the ABS-15G; roles not stated) Retained Vantage master trust term notes, Series 2025-1 — — ABS-15G 2025-08-11 (Retained Vantage Data Centers, LP Bond — 5.091% 2025-08 2050-08-15 secured confirmed
Vantage Data Centers Deutsche Bank Securities (arranger per press; named in the ABS-15G) Secured Data Center Revenue Term Notes, Series 2025-1 Class A-2 ($337M) — — ABS-15G 2025-07-28 (Deloitte agreed-upon procedures, Vantage Data Centers Issuer, LLC Series 2025-1) Bond 337 5.132% 2025-09 2055-08-15 secured confirmed
Vantage Data Centers Guggenheim Securities (named in the ABS-15G; role not stated) Secured Data Center Revenue Term Notes, Series 2025-2 Class A-2 and Series 2025-3 Class B (North American master trust) — — ABS-15G 2025-10-30 (Vantage Data Centers Holdings, LLC Bond — 5.239% 2025-11 2055-11-15 secured confirmed
Vantage Data Centers Barclays Bank PLC (sole structuring advisor; joint lead manager and bookrunner) +1 UK ABS: £200M tap of Class A-2 + new £54M Class B — — Vantage Data Centers release 2026-01-15 Bond 340 6.172% 2026-01-15 2039-05-28 secured confirmed
Vantage Data Centers Ares Management funds (arranger; about $1.6B of the commitment) +1 $2.4B debt facility arranged by Ares (North American portfolio) — — Ares announcement via pulse2 2026-02-14 (quotes from Ares and Vantage) Credit facility 2,400 Undisclosed 2026-02-10 — other confirmed
Vantage Data Centers Evercore (lead arranger) +2 $2B development revolving credit facility (North American platform) — — Vantage release 2026-09-14 Credit facility 2,000 Undisclosed 2026-09-14 Undisclosed secured confirmed
Vantage Data Centers JPMorgan + MUFG (leads) per Bloomberg +1 Lighthouse campus debt package (Stargate: Oracle/OpenAI) Oracle, OpenAI Port Washington, Wisconsin release Bloomberg (all debt terms, press): DCD 2025-09-05 relay (linked) and Bloomberg 2025-10-23 'Record $38 Billion Debt Sale Nears for Oracle-Tied Data Centers' (not linked) Credit facility 14,750 SOFR +2.50% Package reported 2025-09-04; “record $38B sale nears” 2025-10-23 (both Bloomberg) Undisclosed other press
Vantage Data Centers JPMorgan + MUFG (leads); BNP Paribas, Goldman Sachs, Societe Generale, SMBC, Wells Fargo underwriting (press); distributed across 2-dozen+ institutions by Apr 2026 (Bloomberg) Frontier campus debt package (Stargate: Oracle/OpenAI) Oracle, OpenAI press Shackelford County, Texas release Bloomberg (all debt terms, press): DCD 2025-09-05 relay (linked) and Bloomberg 2026-04-15 'Oracle-Tied $38 Billion Debt Takes Months for Market to Swallow' (not linked) Credit facility 23,250 SOFR +2.50% Underwrite reported 2025-08-20; distribution reported ~complete 2026-04-15 (both Bloomberg) Undisclosed other press
VIRTUS Data Centres (STTGDC) Standard Chartered (mandated lead arranger and hedging bank) +1 EUR 210M development facility, Marienpark Berlin campus (four buildings, up to 57.6 MW) — — Standard Chartered release 2026-02-05 Credit facility 247.8 Undisclosed 2026-02-05 — other confirmed
VIRTUS Data Centres (STTGDC) BNP Paribas (coordinator, senior mandated lead arranger, bookrunner) +4 GBP 2.45B committed portfolio financing incl. GBP 1.2B green capex facility (term and revolving) — — VIRTUS release 2026-09-24 Credit facility 3,239 Undisclosed 2026-09-24 — other confirmed
Yondr Group (DigitalBridge / La Caisse) DBS Bank +6 More than US$900M project financing, 98 MW first phase of the Johor campus (Sedenak Tech Park) — — Yondr release 2024-12-23 Credit facility 900 Undisclosed 2024-12-23 — other confirmed
Yondr Group (DigitalBridge / La Caisse) Barclays (sole structuring advisor and sole green structuring coordinator; joint lead manager and joint bookrunner) +2 £532M green securitized term notes, Series 1A Class A (Slough campus) — — Yondr release 2026-02-20 Bond 718.2 5.483% 2026-02-20 2056-02-28 secured confirmed
Yondr Group (DigitalBridge / La Caisse) Noteholders (qualified institutional buyers and non-U.S. investors; initial purchasers not named) $715M 6.875% senior secured notes due 2031, 48 MW Loudoun County (Virginia) data center — — DataCenterNews (U.S. edition) 2026-06-26 (Yondr JK 1 notes pricing) Bond 715 6.875% 2026-06-26 2031-06-30 secured press
Yotta Data Services (Hiranandani Group) State Bank of India ₹1,357 crore SBI long-term facility (incl. ₹800 crore NCDs) — — CRE Matrix 2024-02-13 (citing documents Credit facility 163.1 8.85% 2024-02 ~2036 other press
Zenith Arc LLC (Prairieland Rivers LLC) Bookrunners not named in accessible sources $2.25B senior secured green notes due 2031 (149 MW Oklahoma facility; Jane Street 15-year lease) Jane Street, Fluidstack press Okmulgee County, Oklahoma press briefs.co 'Market-making giant's lease guaranty anchors $2.25B data center bond' (2026-08-13) Bond 2,250 8.875% 2026-08-13 2031-08-31 secured press

Filter, search, or click a column header to sort (a third click restores the ledger order); drag a header edge to resize. Hover a cell for entity, collateral and size notes. Status: confirmed by a company, lender or arranger statement; press, from reporting only; rumored, in talks with no close announced. Tenant and site link the document they come from. A tag marks a value taken from an issuer release (release), from reporting only (press) or inferred from the filings (inferred). A named backstop is outside support from a third party.

Retired and excluded instruments

Instruments verified repaid, extinguished, settled, superseded, or determined not to be debt. They stay listed so the history can be audited.

  • TeraWulf Inc.
    • LGSA term loans ($146.0M, 11.5%) repaid in full July 2024; equipment financing nil (FY2025 10-K Note 10)
  • Applied Digital Corporation
    • Excluded: Macquarie preferred units in APLD HPC TopCo 2 ($1.8B through May 31, 2026; 12.75%, PIK allowed) are a redeemable noncontrolling interest, not debt (FY26 10-K Note 16)
    • Nov 2025 FNBO $65M revolver (SOFR+2.75%, $61.9M LCs at 2/28/26): RESOLVED 2026-05-29, replaced by the 2026 RCF. Its payoff and lien release were a closing condition (2026 Credit Agreement Sec. 4.01(l)). Tracked as instrument apld-rcf-2025
  • Cipher Mining Inc. (renamed Cipher Digital Inc.)
    • Bitmain future-sales obligations (Original Agreement 12/16/23; prepaid May 2025 at 10% discount) — never balance-sheet debt (miner purchase obligation through Deposits on equipment; ABTC-pledge precedent), stays retired (ruled 2026-08-28)
  • Core Scientific, Inc.
    • Exit credit facility repaid and 12.50% Secured Notes due 2028 redeemed, Aug to Sep 2024 (8-K Aug 19, 2024). Equipment and settlement notes ($37.1M at 12/31/24) repaid or matured in 2025 (FY2025 10-K Note 8).
    • Polaris DS acquisition (not debt): closed Aug 13, 2026 for about $444.3M cash, subject to adjustments (8-K Aug 14, 2026). A further $40M is payable if 40 MW more firm capacity arrives before Dec 31, 2026.
  • Hut 8 Corp.
    • NYDIG (2023) — predecessor-company (USBTC) MEFA ~$96.7M settled via Pecos TX asset transfer 2/3/23, ten months before the Hut 8/USBTC combination; never a Hut 8 Corp obligation, stays retired (ruled 2026-08-28)
    • No Vega project debt exists in any filing (Bitmain hosting arrangement)
    • ABTC BTC pledges to Bitmain are purchase-price pledges, not debt
  • Soluna Holdings, Inc.
    • Yorkville SEPAs = equity purchase agreements, not debt
  • RD Michigan Property Owner I LLC (Related Digital / Blackstone JV)
    • related-saline-barn — duplicate of related-digital-saline-2045 (same RD Michigan Property Owner I LLC $14B 7.500% senior secured notes due 2045, Saline Township MI campus, PIMCO anchor, BofA structuring agent, both dated 2026-04-24); merged 2026-09-17

Sources & method

Every row comes from a primary document, linked on the row: an SEC filing, a bond-holder filing, an issuer or lender release, or for some private deals a press report, marked as such. Undisclosed stays undisclosed.

Scope. An issuer joins when one of its financings is secured by a data center: a landlord or project company, an operator's campus, data-center asset-backed notes or construction debt. Its other debt joins with it. Issuers that pledge GPUs are on GPU Debt, with their whole stack.

Tenant and site. Taken from each row's filings, a document at a time. Each value links its document. A tag marks a value taken from an issuer release, from press reports only, or inferred from the filings. A redacted tenant is shown as redacted. A third-party backstop is a company outside the deal that stands behind the tenant's payments.

Coverage. The public issuers' filings are checked each business day. Private landlords and joint ventures are added from their releases, bond-holder filings and reporting. The headline adds the debt signed since January 2024, the same deals the issuance chart shows.

Dated analysis of these bonds: Data-Center Bonds Price the Tenant (September 25, 2026).