Crusoe

CCIR tracks 11 instruments issued by Crusoe. Click any dot or bar to see that instrument’s terms. Updated Nov 9, 2026.

Floating Spreads at Signing

Capital stack by borrower

Which entity owes what, as filed. Facilities raised in a subsidiary sit on that subsidiary's assets, plus any parent guaranty shown on the card. The parent's own paper sits beside them.

BorrowerInstrumentSize $mRate
Crusoe (parent level) Goldman Sachs loan, AMD backstop 300 6.00%
$509M senior secured GPU delayed-draw term loan due November 2030 (launched; close not confirmed) 509 Undisclosed
Victory Park Capital facility 175 Undisclosed
Brookfield credit facility 750 Undisclosed
Upper90-led syndicated credit facility 225 Undisclosed
SVB Capital / Sparkfund / Generate credit facilities 155 Undisclosed
Upper90 project financing 40 Undisclosed
Upper90 initial equipment loan — Undisclosed
Blue Owl / Crusoe / Primary Digital Abilene JV Abilene Phase 2 construction loan 7,100 SOFR +2.25%
Abilene DC 1, LLC Abilene Phase 1 construction loan 2,288 SOFR +2.50%
Crusoe Technologies LLC First GPU debt facility 200 Undisclosed

Instruments

Goldman Sachs loan, AMD backstop

Credit facility $300m 6.00% Reported 2026-02-19/20
Seniority
Secured (AMD chips + equipment)
Maturity
Undisclosed
Collateral
AMD chips + equipment; AMD commits to lease back chips if customers lapse (vendor credit-enhancement backstop); Ohio DC built by 5C
Lenders
Goldman Sachs (arranger) · AMD (credit enhancement)
Pricing
~6% press-reported; tenor undisclosed. Close unconfirmed — no company/lender release
Terms
~$300M press-reported

Source: The Information; Reuters pickup · document

$509M senior secured GPU delayed-draw term loan due November 2030 (launched; close not confirmed)

Credit facility $509m Undisclosed Launched 2026-09-10; close not reported
Seniority
Senior secured (press)
Maturity
2030-11 — Due November 2030 (press).
Collateral
Not stated (press)
Lenders
Goldman Sachs (sole arranger, press)
Terms
Octus reported on 2026-09-10 that Crusoe launched a $509M senior secured delayed-draw term loan due November 2030 to finance GPU capital expenditures, with Goldman Sachs as sole arranger. No close reported as of 2026-11-09.

Source: Octus headline, 2026-09-10 (paid database; not linked)

Victory Park Capital facility

Credit facility $175m Undisclosed Entered 2025-08-25
Seniority
Asset-backed in character (inferred; the release says Victory Park specializes in private asset-backed credit)
Maturity
Undisclosed
Collateral
Funds GB200 NVL72 at atNorth ICE02, Iceland; collateral unspecified (release)
Lenders
Victory Park Capital (Janus Henderson affiliate)
Terms
$175M credit facility to deploy GPU hardware at atNorth ICE02 (release). Holder filings (fund N-PORT/N-CSR holdings lists and BDC schedules of investments), not issuer documents, show further Crusoe loans. Funds hold Crusoe Energy Systems LLC first-lien fixed-rate term loans at 13% to 16.25%, due 2029-01-21 to 2029-11-13. Some are labeled Tranche II and Tranche III, acquired 2025-11-13. Holders include LAGO Evergreen Credit, Monroe Capital Income Plus, Cliffwater Enhanced Lending Fund, FS Credit Opportunities and Privacore VPC Asset Backed Credit Fund. The loans may be tranches of this facility or of another Crusoe facility.

Source: Crusoe newsroom · document

Brookfield credit facility

Credit facility $750m Undisclosed Entered 2025-06-11
Seniority
Corporate-level growth capital
Maturity
Undisclosed
Collateral
Collateral unspecified ("AI factories")
Lenders
Brookfield Asset Management (Infrastructure Debt); Eastdil advised

Source: Crusoe newsroom · document

Abilene Phase 2 construction loan

Credit facility $7,100m SOFR +2.25% Entered 2025-05-22
Borrower
Blue Owl / Crusoe / Primary Digital Abilene JV (borrower — not Crusoe corporate)
Seniority
Project-level
Maturity
Undisclosed — Holder filings disagree on the same positions: PIMCO funds list 2030-04-30, Bridge Builder lists 2028-06-09. Left undisclosed until a filing settles it.
Collateral
6 more buildings → 1.2 GW campus
Offtaker
Oracle (build-to-suit leases on six buildings)
Lenders
J.P. Morgan-led consortium (others unnamed); Newmark arranged · Holders of record include PIMCO-managed funds and Bridge Builder Core Plus Bond Fund (holder filings)
Pricing
SOFR + 2.25% per holder filings (PIMCO and Bridge Builder fund holdings of the 'Project Flash 2.0' term loans to Abilene DC 3 through 8, LLC), not issuer documents.
Terms
Within $11.6B debt+equity phase-2 package; $15B JV

Source: Newmark release · document

Upper90-led syndicated credit facility

Credit facility $225m Undisclosed Entered 2025-03-27
Seniority
Not stated; Upper90 describes itself as an asset-backed private credit firm (release)
Maturity
Undisclosed
Collateral
Collateral unspecified; proceeds exclusively for NVIDIA GPUs + cloud infrastructure (release)
Lenders
Upper90 (lead) · BCI · FS Investments · King Street · Liberty Mutual Investments · ORIX USA
Terms
Approximately $225M (release). Holder filings (fund N-PORT/N-CSR holdings lists and BDC schedules of investments), not issuer documents, show further Crusoe loans. Funds hold Crusoe Energy Systems LLC first-lien fixed-rate term loans at 13% to 16.25%, due 2029-01-21 to 2029-11-13. Some are labeled Tranche II and Tranche III, acquired 2025-11-13. Holders include LAGO Evergreen Credit, Monroe Capital Income Plus, Cliffwater Enhanced Lending Fund, FS Credit Opportunities and Privacore VPC Asset Backed Credit Fund. The loans may be tranches of this facility or of another Crusoe facility. FS Investments, which joined this syndicate, manages FS Credit Opportunities.

Source: Upper90 release + Crusoe newsroom · document

Abilene Phase 1 construction loan

Credit facility $2,288m SOFR +2.50% Entered 2024-12-16
Borrower
Abilene DC 1, LLC (borrower; not Crusoe corporate), wholly owned by Longhorn JV, LLC. BOREC Longhorn Member, LLC holds 92.3% of Longhorn JV and Crusoe Abilene, LLC holds 7.7% (Ex. 99.3, Notes 1 and 6). Blue Owl Real Estate Net Lease Trust files the borrower statements.
Seniority
Project-level construction loan
Maturity
2028-01-09 — Interest only; two one-year extension options (Note 4)
Collateral
206 MW build-to-suit leased to Oracle (Stargate flagship)
Offtaker
Oracle (single tenant of both buildings; 15-year leases from rent commencement in 2025)
Lenders
J.P. Morgan; Newmark arranged
Pricing
Term SOFR + 2.5%, or an alternate or prime rate set at each draw (Note 4); weighted average 6.73% at 2025-12-31. Swaps fix part of the floating portion at a 3.980% strike.
Terms
Filed: construction loan entered 2024-12-16, up to $2,288,000,000, interest only; $2,025,860,971 outstanding at 2025-12-31 (Abilene DC 1, LLC financial statements, Note 4). Newmark's release (2025-01-22) announced it as $2.3B.

Source: Abilene DC 1, LLC financial statements, Ex. 99.3 to the Blue Owl Real Estate Net Lease Trust 10-K for FY2025 (acc 0001944366-26-000020), Note 4; Newmark release 2025-01-22 · document

First GPU debt facility

Credit facility $200m Undisclosed Entered 2023-10-23
Borrower
Crusoe Technologies LLC (the announcing company)
Seniority
GPU asset-backed
Maturity
Undisclosed
Collateral
GPU asset-backed (release: asset-backed financing from Upper90 for the purchase of GPUs)
Lenders
Upper90
Terms
Initial commitment of $200M from Upper90 for the purchase of GPUs (release). Per holder filings, not issuer documents: Variant Alternative Income Fund holds a Crusoe Energy Systems equipment-finance loan at 17.00%, due 2027-11-30. The fund first acquired it 2023-09-28 (N-PORT, 2026-07-31). It may belong to this facility or to another Crusoe financing.

Source: Crusoe newsroom · document

SVB Capital / Sparkfund / Generate credit facilities

Credit facility $155m Undisclosed Entered 2022-04-21
Seniority
Equipment/project-level
Maturity
Undisclosed
Collateral
Energy systems
Lenders
SVB Capital · Sparkfund · Generate Capital
Terms
Up to $155M (expandable). The release states only this expandable ceiling, so the size carries it. It calls the facilities corporate credit capacity for energy systems related to flare mitigation. Ducera Partners advised Crusoe on the debt.

Source: Crusoe newsroom · document

Upper90 project financing

Credit facility $40m Undisclosed Entered 2021-04-26
Seniority
Project-level, non-dilutive
Maturity
Undisclosed
Collateral
Flare-mitigation systems (inferred from Crusoe's 2021 flare-gas business; the release calls it a non-dilutive project financing facility)
Lenders
Upper90

Source: Crusoe newsroom (Series B) · document

Upper90 initial equipment loan

Credit facility Undisclosed Entered 2019
Seniority
Equipment-secured
Maturity
Undisclosed
Collateral
Equipment (flare-gas era)
Lenders
Upper90
Terms
Undisclosed

Source: Upper90 release (disclosed 2025), Crusoe newsroom copy · document

Collateral classes on this page: out, secured_undisclosed, landlord_spv, gpu. The full ledger, with every issuer and the derived credit series, is on GPU Debt Tracker.