Filed: balances through 30 Jun 2026 (Q2 2026 10-Q). Modeled: each facility fully drawn by the end of its draw window, then paid down on its filed schedule, or straight-line to final maturity where none is filed.
Not included: Dorothy 1A Class B … (deferred purchase price, paid by June 2026) · conv (converted in 2024).
Fixed Coupons at Issue
Floating Spreads at Signing
Capital stack by borrower
Which entity owes what, as filed. Facilities raised in a
subsidiary sit on that subsidiary's assets, plus any parent
guaranty shown on the card. The parent's own paper sits beside
them.
Soluna SLC Fund I Projects Holdco LLC (Spring Lane Capital affiliate, seller)
Pricing
No interest disclosed
Terms
Deferred portion of $16.5M consideration ($6.0M cash at the 4/15/26 closing) for 85.4% of the Class B interests in Soluna DVSL JVCo (Dorothy 1A), taking ownership to 100%. Deferred M&A consideration, tracked as debt-like. PAID as of 6/30/26, ahead of/at the 7/1/26 due date (Q2-26 10-Q). The Q2-26 10-Q MD&A says the balance was paid in June 2026.
2030-09-12 — Repaid in October 2026, by the 10/26/26 release (8-K)
Collateral
First liens on substantially all assets of all Borrowers and guarantors, incl. Briscoe Wind Farm; equity pledges incl. Soluna DV Wind HoldCo; mortgages incl. the Briscoe 149.85 MW site (TX). Dorothy 1A/2 liens stay until the facility ends.
Term SOFR + 8.0% (3.50% floor) or ABR + 7.0%; 11.62% at 6/30/26, the last report before repayment
Terms
$12.5M funded at close (net proceeds ~$11.5M after ~$977K issuance costs; warrants at $1.6M fair value recorded as discount) per the Q2-26 10-Q. Only drawn tranche after the 8/10/26 A-1/A-3 prepayment (~$9.6M net). DSCR first tested 9/30/26. The filed covenant excludes Briscoe from the forward contracted DSCR. REPAID IN FULL in October 2026, by the 10/26/26 release. The facility is terminated and Generate's liens are released (8-K and release, 10/26/26). The release says this lets Briscoe power move to the Dorothy 3 AI campus.
REPAID IN FULL 2026-06-10 (~$1.1M; Q2-26 10-Q) Kept off issuance totals: made under the Equipment Loan Agreement, so a draw inside slnh-springlane-equip's $4.0M commitment, not a separate signing (Q2-26 10-Q).
Term SOFR + 10.0% (3.50% floor; +2% default). 13.65% at 6/30/26, the last report before prepayment.
Terms
Size is the $17.0M drawn: A-1 $5.5M + A-3 $11.5M (Q1-26 10-Q). At 6/30/26 the entire $27.5M gross principal under the Amended Credit Agreement was classified current (net of $4.4M unamortized costs); A-1/A-3 portion $13.5M net; Tranche B commitment cut $18.5M to $6.0M by Amendment No. 1 (eff. 4/1/26). PREPAID IN FULL 2026-08-10: Tranche A-1 + A-3 prepaid ~$19.1M incl. accrued interest and $3.9M prepayment premium on $15.2M principal; Amendment No. 3 (8/7/26) waived 6/30 DSCR tests conditioned on the prepayment; liens not released until Credit Agreement termination (Q2-26 10-Q). Soluna repaid the remaining Generate debt in October 2026. The facility is terminated and Generate's liens on the project assets are released (8-K and release, 10/26/26). The issuance event counts all $35.5M committed at signing, including Tranche B ($18.5M, Kati). size_usd_m counts Tranches A-1 and A-3 only.
Soluna CloudCo (issuer, with Soluna Cloud and the Company as note parties)
Seniority
Secured
Maturity
2027-07-12 — Per the FY25 10-K debt table
Collateral
Same terms and conditions as the June SPA financing
Lenders
Additional accredited investors (undisclosed)
Pricing
9.0%, default-adjustable (June SPA terms)
Terms
$1.25M Additional Notes issued 7/12/24 on the June SPA terms (same as the $12.5M Green Cloud note); Cloud Additional Warrants as incentive. EXTINGUISHED 2025-03-14: Holdings bought the notes at 60% of face ($750K via principal, 50% interest payments and 20% SEPA funds) and holds them as intercompany debt; ~$551K gain (FY25 10-K).
Soluna AL CloudCo, LLC (issuer); Soluna Holdings co-obligor
Seniority
Secured. Parent guarantor with an all-asset lien since 6/2024; direct co-obligor since 3/21/25
Maturity
2027-06-20
Collateral
Substantially all CloudCo assets plus an assignment of the HPE SOW and MSA. Soluna Cloud guaranty: its assets and a CloudCo pledge. Soluna Holdings guaranty: its assets and a Soluna Cloud share pledge.
Lenders
GreenCloud Partners, LLC (f/k/a Green Cloud Holdings, LLC)
Pricing
Convertible to 2.5M shares @ $5.00
Terms
$6.014M carrying 6/30/26, all current (originally $12.5M; Q2-26 10-Q)
Up to $1.0M at signing, $4.0M from 2/28/25. Draws of $720K (2024), $810.6K (2025) and $1.075M (land, 10/1/25) were all repaid, the first two in project equity. No obligations remain at 6/30/26 (Q2-26 10-Q). Draw dates: $720K on 5/17/24 repaid 7/22/24; 2025 draws on 3/21, 6/11 and 7/16 repaid 8/1/25 (FY2025 10-K Note 8).
Loan and Security Agreement filed as Ex. 10.73 to the Q1 2023 10-Q (acc 0001493152-23-017349): a continuing lien on the borrower's property, including accounts, cash, contract rights under the Material Project Documents, deposit accounts and equipment (s. 3.1); cash-sweep repayment
Lenders
Navitas West Texas Investments SPV, LLC
Pricing
15% per the FY25 10-K debt table
Terms
$2,050,000 two-year loan (5/9/23) from the Dorothy 1B partner. Repaid early in Q1 2025, before the 5/9/25 maturity; day not filed (Q1-25 10-Q; FY24 10-K). $0 at 12/31/25 (FY25 10-K).
Convertible$16.3mUndisclosedEntered 2021-10-25Converted to stock 2024-12-12
Borrower
Soluna Holdings, Inc.
Seniority
Secured
Collateral
Secured under the October SPA (detail in 10/25/21 8-K exhibits)
Lenders
Certain accredited investors (undisclosed)
Pricing
No stated coupon; 8% OID; 18% after maturity or default (10/2021 8-K, original terms)
Terms
$16.3M aggregate principal for $15M purchase price (OID); initially convertible into 1,776,073 shares at $9.18; Class A/B/C warrants alongside. Restructured by 7/19/22 Addendum + 9/13/22 amendment (treated as extinguishment; thereafter at fair value). FULLY CONVERTED: the final three holders converted 12/12/24; no convertible notes outstanding at 12/31/24 (FY25 10-K).